FIELD: building structures, particularly shallow foundations.;SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.;EFFECT: reduced time, increased simplicity of foundation building and reliability.;2 cl, 5 dwg
展开▼