首页> 外国专利> METHOD FOR INCOMPETENT MUD SHALE BED PENETRATION DURING DRILLING OPERATION

METHOD FOR INCOMPETENT MUD SHALE BED PENETRATION DURING DRILLING OPERATION

机译:钻井过程中泥质页岩渗透力不强的方法

摘要

FIELD: oil and gas well drilling, particularly to penetrate incompetent mud shale bed.;SUBSTANCE: method involves performing subdrilling by chisel within the boundaried of bed consisting of incompetent mud shale with the use of visco-plastic drill fluid circulating in annular well bore cavity. Drill fluid flow is within laminar regime. To provide guaranteed laminar drill fluid flow and, therefore, to provide penetration of above bed without well wall caving the selected flow rate of drill fluid Q is 20-30% less than critical flow rate Qcr corresponding to transition from laminar regime to turbulent one. The selected visco-plastic drill fluid must have minimal possible filtration efficiency.;EFFECT: prevent well erosion and well wall caving during incompetent mud shale bed drilling.
机译:领域:油气井钻探,尤其是穿透不称职的泥页岩床。实质:该方法涉及在环形井眼中循环的粘塑性钻井液的作用下,在由不称职的泥页岩组成的床层边界内用凿子进行钻探。 。钻井液流在层流范围内。为了提供有保证的层状钻井液流量,从而在没有井壁崩落的情况下提供上层的穿透力,所选的钻井液流量Q比临界流量Q cr 低20-30%。从层流状态过渡到湍流状态。所选的粘塑性钻井液必须具有尽可能低的过滤效率。效果:在不称职的泥页岩床钻井过程中,防止井眼侵蚀和井壁崩落。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号