首页> 外国专利> Process for operating a wind park consisting of a number of wind energy plants comprises controlling the operations of each plant until the net electrical power is supplied up to a predetermined maximum value

Process for operating a wind park consisting of a number of wind energy plants comprises controlling the operations of each plant until the net electrical power is supplied up to a predetermined maximum value

机译:用于运行由多个风力发电站组成的风力发电场的过程,包括控制每个电厂的运行,直到提供的净电功率达到预定最大值为止

摘要

Process for operating a wind park consisting of a number of wind energy plants comprises controlling the operations of each plant until the net electrical power is supplied up to a predetermined maximum value. - Independent claims are also included for the following: - (1) Wind park having a central control installation; and - (2) Wind energy plant. - Preferred Features: Electrical energy for driving the wind energy plant is based on one or more wind energy plants already in the production mode. The wind energy plants are operated with the lowest possible energy requirement for a prescribed operation.
机译:用于操作由多个风能设备组成的风电场的过程包括控制每个设备的操作,直到净电力被供应到预定最大值为止。 -还包括以下方面的独立权利要求:-(1)具有中央控制装置的风电场; -(2)风能发电厂。 -首选功能:用于驱动风能设备的电能基于已经处于生产模式的一个或多个风能设备。风能发电厂以规定的运行方式以最低的能源需求运行。

著录项

  • 公开/公告号DE10320087B4

    专利类型

  • 公开/公告日2005-04-28

    原文格式PDF

  • 申请/专利权人 WOBBEN ALOYS;

    申请/专利号DE20031020087

  • 发明设计人 WOBBEN ALOYS;

    申请日2003-05-05

  • 分类号F03D7/00;F03D9/02;

  • 国家 DE

  • 入库时间 2022-08-21 22:01:28

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号