首页>
外国专利>
Thrust peg system transmitting transverse forces between concrete sections, builds-in bushes into each section and inserts thrust peg, which is relocated into final position bridging gap between sections
Thrust peg system transmitting transverse forces between concrete sections, builds-in bushes into each section and inserts thrust peg, which is relocated into final position bridging gap between sections
The first peg bushing (1) is built into the first section (2). A second peg bushing (3) is built into a second section (4). The thrust peg (5) can be slid from an assembly position into a final position, where it bridges a gap left between the two sections (2, 4). The pegs may be slid into the final position by an arrangement of ball bearings in a curved track, by a force directed at right angles to the pegs.
展开▼