首页> 外国专利> Heating, ventilation and air-conditioning installation controlling initialization process for tertiary building, involves enabling folding and deployment of mobile unit based on wind effect and wind speed, respectively

Heating, ventilation and air-conditioning installation controlling initialization process for tertiary building, involves enabling folding and deployment of mobile unit based on wind effect and wind speed, respectively

机译:加热,通风和空调装置的控制初始化建筑物的初始化过程,涉及分别基于风效应和风速实现移动单元的折叠和展开

摘要

The process involves enabling a folding action of a mobile unit when a value measured by a wind effect measuring sensor is greater than a wind effect threshold value. The mobile units are deployed when wind speed measured is lower than wind speed threshold value. Independent claims are also included for the following: (a) a learning process for controlling an installation (b) an installation comprising motorized devices.
机译:该过程涉及当由风效应测量传感器测量的值大于风效应阈值时,使移动单元能够折叠动作。当测得的风速低于风速阈值时,将部署移动单元。还包括以下方面的独立权利要求:(a)用于控制设备的学习过程(b)包括机动设备的设备。

著录项

  • 公开/公告号FR2861123A1

    专利类型

  • 公开/公告日2005-04-22

    原文格式PDF

  • 申请/专利权人 SOMFY;

    申请/专利号FR20030012041

  • 发明设计人 NEUMAN SERGE;GREHANT BERNARD;

    申请日2003-10-15

  • 分类号E06B9/68;G05B9/02;

  • 国家 FR

  • 入库时间 2022-08-21 21:58:19

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号