首页> 外国专利> Secondary pipeline and main pipe connection replacement process for residence, involves placing threaded stopper on pipe`s tapped drilling, dismounting connection, positioning new connection and replacing tool on stop gate of new connection

Secondary pipeline and main pipe connection replacement process for residence, involves placing threaded stopper on pipe`s tapped drilling, dismounting connection, positioning new connection and replacing tool on stop gate of new connection

机译:二次管线和主管更换连接的过程,包括将螺纹塞子放在管道的螺纹钻上,拆卸连接,放置新连接,并在新连接的闸门上更换工具

摘要

The process involves closing an outlet of a stop gate (4) of a hydraulic connection (3), between a secondary pipeline (2) and a main pipe (1), with a tool (7). The gate is opened and drilling of the pipe is tapped with the tool. A threaded stopper is placed on the tapped drilling and the connection is dismounted. A new connection is positioned again, the tool on the gate of the new connection is replaced and the stopper is removed. An independent claim is also included for a unit for implementing a process of replacing secondary pipeline and main pipe connection.
机译:该过程包括用工具(7)关闭液压管道(3)的闸门(4)的出口,该出口在次级管道(2)和主管(1)之间。打开闸门,用工具攻打管道钻孔。螺纹塞子放在螺纹钻上,并断开连接。再次放置新的连接,更换新连接的浇口上的工具,并卸下塞子。还包括用于实施替换次级管道和主管连接的过程的单元的独立权利要求。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号