首页>
外国专利>
Secondary pipeline and main pipe connection replacement process for residence, involves placing threaded stopper on pipe`s tapped drilling, dismounting connection, positioning new connection and replacing tool on stop gate of new connection
Secondary pipeline and main pipe connection replacement process for residence, involves placing threaded stopper on pipe`s tapped drilling, dismounting connection, positioning new connection and replacing tool on stop gate of new connection
The process involves closing an outlet of a stop gate (4) of a hydraulic connection (3), between a secondary pipeline (2) and a main pipe (1), with a tool (7). The gate is opened and drilling of the pipe is tapped with the tool. A threaded stopper is placed on the tapped drilling and the connection is dismounted. A new connection is positioned again, the tool on the gate of the new connection is replaced and the stopper is removed. An independent claim is also included for a unit for implementing a process of replacing secondary pipeline and main pipe connection.
展开▼