CONSTRUCTION OF SMALL-SCALE PIT USING SIMPLE LINING EARTH RETAINING MATERIAL

机译:用简单的衬砌土保持材料建造小型坑

摘要

PROBLEM TO BE SOLVED: To reduce cost by continuously performing extraction and jacking, due to increasing cost since a construction quantity per one day is limited by receiving influence on a work kind quick in a construction speed by a slow work kind, when continuously performing work different in the construction speed such as civil engineering work, towing, jacking, the connection of a water supply pipe and backfilling in a day, when laying a supply pipe.;SOLUTION: When continuously performing the extraction and the jacking of the supply pipe, a pit is required to be put in an already excavated state. Thus, the pit is constructed in advance by using a simple lining earth retaining material realized from a combination of a lining material and an earth retaining material capable of preventing deformation and collapse by covering the excavation surface peripheral edge ground with a steel plate.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:由于连续工作时,由于以缓慢的工作方式对施工速度较快的工作种类的影响受到限制,因此每天的施工量受到限制,因此,由于不断增加的成本,从而通过连续地进行顶升和顶升来降低成本。铺设供水管时,一天的施工速度不同,例如土木工程,拖曳,顶进,供水管的连接和回填;解决方案:连续进行供水管的抽出和顶进时,一个坑必须置于已经开挖的状态。因此,通过使用由衬里材料和能够通过用钢板覆盖挖掘表面外围边缘来防止变形和塌陷的土保持材料的组合实现的简单衬里土壤保持材料来预先构造坑。 :(C)2006,日本特许厅

著录项

  • 公开/公告号JP2006070673A

    专利类型

  • 公开/公告日2006-03-16

    原文格式PDF

  • 申请/专利权人 ASUTEKKU:KK;

    申请/专利号JP20040285393

  • 发明设计人 ASAI MITSURU;

    申请日2004-09-01

  • 分类号E21D1/00;E02D17/08;

  • 国家 JP

  • 入库时间 2022-08-21 21:55:47