首页> 外国专利> CONSTRUCTION METHOD OF RETAINING WALL AND REINFORCEMENT HOLDER FOR RETAINING WALL CONSTRUCTION

CONSTRUCTION METHOD OF RETAINING WALL AND REINFORCEMENT HOLDER FOR RETAINING WALL CONSTRUCTION

机译:挡土墙施工中挡土墙及加固架的施工方法

摘要

PROBLEM TO BE SOLVED: To provide a construction method of a retaining wall capable of eliminating work required for such as a special technical skill or experience to make welding or pressure welding of short reinforcing bars one after another to extend without requiring the assembling and dismantling of a scaffold in the back of a block.;SOLUTION: The construction method of the retaining wall aiming at the block formed of a front plate forming the front of the retaining wall, a brace plate receiving weight of a backfilling material and a vertical groove as a secure space of reinforcement in the back of the front plate. In the case of construction, the reinforcement is held by a reinforcement holder. The reinforcement holder is constituted of a holding plate holding the arrangement of a plurality of reinforcing bars from both sides thereof, a leg holder provided to the end section of the holding plate and a leg inserted in the leg holder.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:提供一种挡土墙的施工方法,该施工方法能够消除诸如短技术钢筋的焊接或压力焊接接连地延伸而无需特殊的技术技能或经验所需要的工作,而无需组装和拆卸解决方案:挡土墙的施工方法针对的是挡土墙,该挡土墙是由形成挡土墙前部的前板,承受重量的回填材料的支撑板和一个垂直槽构成的。前面板背面的安全加固空间。在建筑的情况下,钢筋由钢筋支架固定。加强件支架由一个从其两侧固定多根钢筋的布置的支撑板,一个设置在支撑板端部的支腿支架和一条插入支腿支架中的支腿组成。版权所有:(C) 2006年,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号