LIFTING DEMOLISHING METHOD OF STEEL TOWER AND TOWER BODY RECEIVING METAL FITTING FOR THIS METHOD

机译:钢丝塔吊装拆卸方法及该方法的塔身接收金属配件

摘要

PROBLEM TO BE SOLVED: To provide a lifting demolishing method of a steel tower capable of safely and efficiently demolishing and removing the internally attached steel tower of installing an upper main column material inside a lower main column material by using a helicopter, by forming the main column material of an L-shaped steel material.;SOLUTION: A joint bolt of a separation part J of a tower body is left by some pieces, and the other joint bolt is extracted. Next, a bracket 10 is respectively fastened inside the four lower main column materials 5b in the separation part J by bolts. An upper side segment 2 is supported by its bracket 10, and the joint bolt of the separation part is wholly extracted, and afterwards, two sets of upper main column materials 5a of a diagonal position are drawn in the mutually approaching direction by a pulling tool 13 up to releasing taper fitting with the lower main column materials 5b. In this state, a suspension wire 6 installed in advance on an upper side segment 2 of a tower body is hooked on a hook 16 suspended from the helicopter 15, and the upper side segment 2 is lifted.;COPYRIGHT: (C)2007,JPO&INPIT
机译:要解决的问题:提供一种能够安全有效地拆卸和拆除内部安装的钢塔的钢塔的提升拆卸方法,该方法是通过使用直升飞机通过将直立的主柱安装在下部的主柱材料中来安装上部的主柱材料。解决方案:塔身分离部分J的一个连接螺栓被留下一些碎片,而另一个连接螺栓被拔出。接下来,通过螺栓将托架10分别固定在分离部J中的四个下部主柱材料5b的内部。上侧部段2由其托架10支撑,并且分离部分的连接螺栓被整体拉出,然后,通过拉动工具沿相互接近的方向拉出两组对角线位置的上主柱材料5a。直到松开与下部主柱材料5b的锥度配合为止的图13所示。在这种状态下,预先安装在塔架上侧部分2上的吊线6钩在从直升机15悬挂的吊钩16上,并抬起上侧部分2。版权所有:(C)2007,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号