首页> 外国专利> METHOD OF COMPUTING CONSTRUCTION PERIOD, CONSTRUCTION COST, CONSTRUCTION MANPOWER OR CONSTRUCTION MATERIAL

METHOD OF COMPUTING CONSTRUCTION PERIOD, CONSTRUCTION COST, CONSTRUCTION MANPOWER OR CONSTRUCTION MATERIAL

机译:施工期,施工成本,施工人员或施工材料的计算方法

摘要

PROBLEM TO BE SOLVED: To further enhance accuracy in computing a construction period or the like in view of each yield in a method of computing the construction period, a construction cost, construction manpower or construction materials of an object building.;SOLUTION: In obtaining either one of the construction period, construction cost, construction manpower and construction materials concerning the building to be constructed, a construction unit period, a construction unit cost, construction unit manpower or construction unit material reduced at an exponential rate against the increase of construction architectural area of the building is obtained as variable yield which is the standard unit quantity, for computation.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:在计算建造周期,方法成本,建筑人力或目标建筑物的建筑材料的方法中,考虑到每种收益进一步提高计算建造周期等的准确性。与要建造的建筑物有关的施工期,施工成本,施工人力和建筑材料中的任何一个,施工单位期间,施工单位成本,施工单位人力或施工单位材料中的任何一项均随着施工建筑的增加而呈指数下降以可变产量作为标准单位数量获得建筑物的面积,以进行计算。;版权所有:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号