Construction method of vented base isolation consolidated restore mechanism and vented base isolation consolidated restore mechanism
Construction method of vented base isolation consolidated restore mechanism and vented base isolation consolidated restore mechanism
展开▼
机译:通风基础隔离加固恢复机构的构造方法及通风基础隔离加固恢复机构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To restore a sill and a foundation to a specified position by constituting this structure of a sill side spring receiver, a sill side metal fitting having steel balls and steel ball retainer, a foundation side metal fitting having a foundation side spring receiver, a spring, and a connection member. ;SOLUTION: Stainless steel balls 8 contained in a steel ball retainer 13 arranged in a sill side receive fitting 3 put between a sill 1 and a foundation 2 rotate between a foundation side metal fitting and the receive fitting in an earthquake. In this case, even if the foundation 2 vibrates vigorously, the transmittion of the horizontal earthquake wave to the sill 1 is lessened, and since the sill 1 is connected to the foundation 2 by the connection member 9, the jumping-up motion of the sill 1 can be restrained even in the vertical motion of an earthquake. Moreover, by installing a recess 27 in the connection member 9, the sill 1 and the foundation 2 become freely movably horizontally by a specified slight diatance in the before and behind and lateral directions in about 360 degrees. In this way, the structure functions as a base isolation structure, and ventilation of the whole periphery of an underfloor of a house is always improved, and the underfloor moisture can be reduced, and the corrosion of the sill is prevented, and further, propagation of termites can be prevented.;COPYRIGHT: (C)2000,JPO
展开▼