首页> 外国专利> Being framework unit for the stone justification framework construction which constructs the framework unit for stone justification

Being framework unit for the stone justification framework construction which constructs the framework unit for stone justification

机译:成为石材辩护框架构建的框架单元,该框架构建石材辩护的框架单元

摘要

PROBLEM TO BE SOLVED: To improve a constructing efficiency of a stone-filled wall having a continuous slope face and reduce the number of parts.;SOLUTION: Parallelogram skeletons (distance-retaining member) 3 are arranged in two positions (three positions including the central part in the drawing) having a distance of a pannel width. Panels made of welded wire nettings are attached to the front face oblique side 3b and the rear face oblique side 3c and connected by a connecting wire coil 6. A beam 10 is laid over between the front face pannel 4 and the rear face pannel 4 to form a frame unit 1. Hooks 4c are formed at the lower end of the vertical wire materials 4a. This frame unit 1 is assembled and filled with stones to form one stage of the wall. The units are stacked one by one to construct several stages of wall. When stacking the frame units 1, the hooks 4c of the pannel 4 of the upper frame unit 1 are engaged with the upper lateral wire material 4b of the pannel 4 of the upper frame unit 1, to engage the upper and lower panels 4. In this way, the upper and lower frame units are mutually connected easily without a separate member.;COPYRIGHT: (C)2001,JPO
机译:解决的问题:为了提高具有连续斜面的碎石墙的建造效率并减少零件数量。解决方案:平行四边形骨架(距离保持构件)3布置在两个位置(三个位置包括在图中的中心部分)具有面板宽度的距离。由焊接网制成的面板附接到正面倾斜侧3b和背面倾斜侧3c,并且通过连接线圈6连接。将梁10放置在正面面板4和背面面板4之间,以形成束。形成框架单元1。在垂直线材4a的下端形成钩4c。该框架单元1被组装并填充有石头以形成墙壁的一级。这些单元被一一堆叠起来,以构成几级墙。当堆叠框架单元1时,上框架单元1的面板4的钩4c与上框架单元1的面板4的上侧线材4b接合,以接合上面板4和下面板4。这样,上下框架单元就可以轻松地相互连接,而无需单独的构件。版权所有:(C)2001,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号