首页> 外国专利> Control method of intermittent aeration activated sludge process

Control method of intermittent aeration activated sludge process

机译:间歇曝气活性污泥法的控制方法

摘要

PROBLEM TO BE SOLVED: To control a sewage treatment process by a two-tank type intermittent aeration method dispensing with a control ORP sensor and stably removing nitrogen and phosphorus. SOLUTION: A flow rate measuring device 10 and a water temp. measuring device 11 both of which enable continuous measurement are arranged to the waste water inflow system of a treatment apparatus and the apparatus is operated by a conventional control method. The aeration time and one cycle of first and second aeration tanks 2a, 2b during a period when treatment is well performed and the inflow flow rate and water temp. data at this time are utilized as learning examples to set not only an input layer to the inflow flow rate and water temp. but also an output layer to the aeration times and one cycle times of the first and second aeration tanks 2a, 2b to construct and learn a neutral network and, on the basis of this, the aeration times and one cycle times of two aeration tanks are set. Further, the inflow flow rate and the reference value of water temp. are preset and the difference or ratio with measured values may be set to the input layer.
机译:要解决的问题:通过采用两罐式间歇曝气方法来控制污水处理过程,该方法采用控制ORP传感器,并稳定地去除氮和磷。解决方案:流量测量装置10和水温。在处理装置的废水流入系统上配置有能够连续测定的测定装置11,该装置通过现有的控制方法进行动作。第一和第二曝气池2a,2b的曝气时间和一个周期在良好执行处理的时期内以及流入流量和水温。此时的数据用作学习示例,不仅将输入层设置为流入流量和水温。第一层和第二层曝气池2a,2b的曝气时间和一个循环时间也是输出层,以构造和学习中性网络,在此基础上,两个曝气池的曝气时间和一个循环时间为组。此外,流入流量和水温的参考值。预设,并且可以将与测量值的差异或比率设置到输入层。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号