首页> 外国专利> In the installation manner and fitting null construction construction phase

In the installation manner and fitting null construction construction phase

机译:在安装方式及装修上空施工施工阶段

摘要

PROBLEM TO BE SOLVED: To achieve a lowering of cost and higher workability by providing the means for easily mounting an overhead travelling lift for nursing at any time since a building stage. ;SOLUTION: At a building work stage, upper parts 3b and 4b of anchor bolts 3 and 4 which have a frame 2 supporting a bolt 1 fastened at lower parts 3a and 4a thereof are fixed on a structural member 5 above the ceiling and then, a ceiling plate 6 is stuck at a lower part of the frame 2 with the tip 1a of the bolt 1 set sticking downward to allow the mounting of a rail 9 free to load or unload in such a manner that a lifter 8 for nursing is fitted into the tip 1a of the bolt 1.;COPYRIGHT: (C)1997,JPO
机译:要解决的问题:通过提供自建造阶段以来随时可以轻松安装用于护理的高架移动式升降机的方法,以降低成本并提高可使用性。 ;解决方案:在建筑工作阶段,将具有框架2的地脚螺栓3和4的上部3b和4b固定在其下部3a和4a上,该框架支撑着螺栓1,然后将其固定在天花板上方的结构部件5上,然后,将顶板6粘贴在框架2的下部,将螺栓1的尖端1a向下固定,以允许以能够安装护理用升降器8的方式自由地装载或卸载轨道9。插入螺栓1的尖端1a中;版权所有:(C)1997,JPO

著录项

  • 公开/公告号JP3749748B2

    专利类型

  • 公开/公告日2006-03-01

    原文格式PDF

  • 申请/专利权人 岡田 勝己;

    申请/专利号JP19950333885

  • 发明设计人 林 健次郎;

    申请日1995-11-28

  • 分类号A61G7/10;

  • 国家 JP

  • 入库时间 2022-08-21 21:48:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号