PROBLEM TO BE SOLVED: To make high-strength lightweight concrete floor slabs of the bridge floor of various kinds of bridges hardly being damaged or broken by wrecking heavy machinery during replacement work for the pavement of the concrete floor slab, thereby lengthening the life of the concrete floor slab and suppressing the progress of rusting of reinforcing steel bars and PC steel material inside the high-strength lightweight concrete floor slab. SOLUTION: Bridge floor of the bridge is constituted with a high-strength lightweight concrete floor slab 1 which is a cured, hardened body of hydraulic mixture of Portland cement, artificial lightweight coarse aggregate and artificial lightweight fine aggregate with a mix proportion ratio by weight of (9.5 to 10.5):(1.05 to 11.5):(11.5 to 12.5) and a polymer cement concrete layer having a thickness of 10 to 25 mm is adhered to the top surface of the pavement side of a precast prestressed concrete floor slab having a bulk density of 1.6 to 1.8 t/m3 after hardening.
展开▼
机译:要解决的问题:要使各种桥梁的桥面地板的高强度轻质混凝土楼板在更换混凝土楼板的工作中几乎不因破坏重型机械而损坏或破坏,从而延长了其使用寿命。混凝土楼板,抑制了高强度轻质混凝土楼板内部钢筋和PC钢材的生锈。解决方案:桥梁的桥面由高强度轻质混凝土楼板1构成,该高强度轻质混凝土楼板1是硅酸盐水泥,人造轻质粗骨料和人造轻质细骨料的水硬性混合物的固化硬化体,其混合比为(9.5至10.5):( 1.05至11.5):( 11.5至12.5),并且将厚度为10至25mm的聚合物水泥混凝土层粘附至预制的预应力混凝土楼板的人行道侧的上表面。硬化后的堆密度为1.6至1.8 t / m3。
展开▼