首页> 外国专利> Natural ground characteristics of the heading front due to the criteria where the natural ground evaluation method in

Natural ground characteristics of the heading front due to the criteria where the natural ground evaluation method in

机译:由于标准中的自然地基评估方法,导致了航向锋线的自然地基特征

摘要

PROBLEM TO BE SOLVED: To enable natural ground evaluation based on advancing boring survey and TBM data, and evaluate the natural ground properties at high accuracy with the latest information. ;SOLUTION: A tunnel boring system is provided with a full section tunnel boring machine(TBM) and advancing boring equipment installed in the TBM. The system is provided with a first evaluating means to evaluate the natural ground properties forward of a cutting face based on the advancing boring survey, a second evaluating means to evaluate the natural ground properties by the cutting face from the TBM data, and a feedback means to feed back the result of the second evaluating means to the evaluation standards of the first evaluating means.;COPYRIGHT: (C)1999,JPO
机译:要解决的问题:基于推进的钻孔测量和TBM数据进行自然地面评估,并使用最新信息以高精度评估自然地面属性。 ;解决方案:隧道掘进系统配备了全断面隧道掘进机(TBM)和先进的掘进设备,安装在TBM中。该系统具有:第一评估装置,其基于前进的钻探测量来评估切割面前方的自然地面特性;第二评估装置,其根据TBM数据通过切割面评估自然地面特性;以及反馈装置。将第二评估工具的结果反馈到第一评估工具的评估标准。版权所有:(C)1999,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号