首页>
外国专利>
Natural ground characteristics of the heading front due to the criteria where the natural ground evaluation method in
Natural ground characteristics of the heading front due to the criteria where the natural ground evaluation method in
展开▼
机译:由于标准中的自然地基评估方法,导致了航向锋线的自然地基特征
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To enable natural ground evaluation based on advancing boring survey and TBM data, and evaluate the natural ground properties at high accuracy with the latest information. ;SOLUTION: A tunnel boring system is provided with a full section tunnel boring machine(TBM) and advancing boring equipment installed in the TBM. The system is provided with a first evaluating means to evaluate the natural ground properties forward of a cutting face based on the advancing boring survey, a second evaluating means to evaluate the natural ground properties by the cutting face from the TBM data, and a feedback means to feed back the result of the second evaluating means to the evaluation standards of the first evaluating means.;COPYRIGHT: (C)1999,JPO
展开▼