首页> 外国专利> Well configuration and method of increasing production from a hydrocarbon well

Well configuration and method of increasing production from a hydrocarbon well

机译:井配置和增加烃井产量的方法

摘要

A well configuration and method of increasing production from a hydrocarbon well having pre-existing production tube. A composite velocity string having an outer diameter smaller than the inner diameter of the production tube is installed in the production tube so that an annular gap is formed between the outer surface of the velocity string and the inner surface of the production tube. Production from the well is increased because the coefficient of fluid flow friction through the composite velocity string, and the amount of heat loss through the composite velocity string, are reduced compared to a steel velocity string. Installation efficiency is also increased because the composite velocity string is much lighter than a steel velocity string.
机译:一种具有预先存在的生产管的从烃井增加产量的井构造和方法。在生产管中安装外径小于生产管的内径的复合速度管柱,从而在速度管柱的外表面和生产管的内表面之间形成环形间隙。与钢制速度串相比,由于通过复合速度串的流体流动摩擦系数以及通过复合速度串的热量损失减少,因此提高了油井的产量。由于复合速度弦比钢速度弦轻得多,因此安装效率也得到了提高。

著录项

  • 公开/公告号US6978843B2

    专利类型

  • 公开/公告日2005-12-27

    原文格式PDF

  • 申请/专利权人 ROBERT ALAN GLEIM;CHANGHUI ZHU;

    申请/专利号US20030427824

  • 发明设计人 ROBERT ALAN GLEIM;CHANGHUI ZHU;

    申请日2003-05-01

  • 分类号E21B7/20;

  • 国家 US

  • 入库时间 2022-08-21 21:41:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号