首页>
外国专利>
METHOD FOR REALIZE SOIL COLUMNS BY DEEP MIXING THE BINDING IN THE GROUND.
METHOD FOR REALIZE SOIL COLUMNS BY DEEP MIXING THE BINDING IN THE GROUND.
展开▼
机译:通过深度混合地面中的绑定来实现土壤柱的方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for realizing a soil column by deep blending of binders in the ground, characterized in that it mainly consists of a sequence of steps, wherein at the place where such soil column is to be realized, a soil survey is carried out in depth for the determination of the nature of the consecutive layers of soil, then for each primer layer is determined which suitable binders are to be used, and at what dose in order to obtain a specific wear resistance of the respective primer layer; at the location of the floor to realize column for each ground layer to bring the thus determined dosage binders under pressure in the respective layer and to blend in with the ground of the respective primer.
展开▼