首页> 外国专利> Sinking piles beneath existing building with foundation, involves injecting material from bottom end of pile and allowing material to set

Sinking piles beneath existing building with foundation, involves injecting material from bottom end of pile and allowing material to set

机译:用基础下沉现有建筑物的桩,涉及从桩底端注入材料并允许材料凝固

摘要

A material is made to flow through the pile (3) so that it flows out of the bottom end and forms a pile supporting region (8) underneath the pile after is has set. A workspace is created above the existing foundation (4) and a hole is then sunk vertically in this area so that it passes through the foundation. Pile driving machinery is set up in the workspace and used to sink a pile in the hole. The workspace is preferably in a cavity (1a) in one of the building walls (1). An independent claim is also included for the foundation pile used to carry out this method, which has an injection device next to its bottom end.
机译:使材料流过桩(3),以使其从底端流出并在放置后在桩下方形成桩支撑区域(8)。在现有基础(4)上方创建一个工作空间,然后在该区域垂直下沉一个孔,以使其穿过基础。打桩机安装在工作区中,用于将桩沉入孔中。该工作空间优选地在建筑物壁(1)之一中的空腔(1a)中。还包括用于执行此方法的基础桩的独立权利要求,该桩的底端附近有一个注射装置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号