首页> 外国专利> WIND-, WAVE- AND CURRENT POWER STATIONS WITH DIFFERENT FOUNDATION SOLUTIONS AND METHODS HOW TO MANUFACTURE, TRANSPORT, INSTALL AND OPERATE THESE POWER STATIONS

WIND-, WAVE- AND CURRENT POWER STATIONS WITH DIFFERENT FOUNDATION SOLUTIONS AND METHODS HOW TO MANUFACTURE, TRANSPORT, INSTALL AND OPERATE THESE POWER STATIONS

机译:具有不同基础解决方案的风能,波能和电流发电站以及如何制造,运输,安装和操作这些发电站的方法

摘要

In this document is described to the production of the electricity and fuel cell meant wind (5), wave (34/41) and current (35) power stations with the different foundation types (3/25/4) and the manufacturing, transporting, installing and operating methods for lowering the costs. The wind, wave and current power stations with their foundations are usually transporting in parts by crane ships from the factory and are based and assembled on the sea, and joined to each other by sea cable to the different kinds of units. Wind (5), wave (34/41) and current (35) power stations with the joined tower foundations (3/25/4) will be assembling in the factory or doc to the ready two or three type joint and separate power stations, will be transporting and installing by the air ship (1) or pontoon frame (9) to the production park so, that the joint power stations are in regular distances and the separate power stations are between and outside of the joint power stations, and that way the power stations will be joining to each other by air wires (49), will be maintaining by the air billow boat (105) with the extension ladder (104), the service diver and air locks (62) or by the helicopter or the air ship (1) and will be using from the operative remote control plant, wherein the electronics (65) are assembled in the centrally way. The manufacturing of the parts of the power stations (5/34/41/35) in the cheaper costs level lands and transporting by the air ship (1).
机译:在此文档中描述的是电力和燃料电池的生产,即具有不同基础类型(3/25/4)的风力发电站(5),波浪发电站(34/41)和电流发电站(35)以及制造,运输,安装和操作方法以降低成本。风力,波浪和水流发电站的基础通常由工厂的起重船进行分批运输,并在海上进行组装,并通过海缆相互连接到不同类型的设备上。风力发电(5),波浪发电(34/41)和电流发电(35)以及相连的塔架基础(3/25/4)将在工厂或文档中组装到现成的两种或三种类型的联合和独立发电站,将由飞船(1)或浮桥架(9)运送并安装到生产园区,以使联合电站之间保持固定距离,并且单独的电站位于联合电站之间和之外,并且这样,发电站将通过气线(49)相互连接,将由带有伸缩梯(104)的空中翻滚船(105),服务潜水员和气闸(62)或直升机进行维护或航空船(1),并将在操作的远程控制工厂中使用,其中电子设备(65)以集中方式组装。在成本较低的土地上制造发电厂的零件(5/34/41/35),并由航空船(1)进行运输。

著录项

  • 公开/公告号WO2006010783A1

    专利类型

  • 公开/公告日2006-02-02

    原文格式PDF

  • 申请/专利权人 LINDBERG JORMA;

    申请/专利号WO2005FI00289

  • 发明设计人 LINDBERG JORMA;

    申请日2005-06-17

  • 分类号F03D9/00;F03D11/00;F03B13/12;E02B17/02;

  • 国家 WO

  • 入库时间 2022-08-21 21:32:47