首页> 外国专利> inner points of the rising and falling of the connection with the introduction of the compressive force that the floor plate is omitted continuous prestressed concrete the concrete construction method

inner points of the rising and falling of the connection with the introduction of the compressive force that the floor plate is omitted continuous prestressed concrete the concrete construction method

机译:连接的上升和下降的内点与引入的压缩力即省略了底板的连续预应力混凝土的混凝土施工方法

摘要

The present invention provides a concrete floor plate was introduced in connection with the compression force rise and fall of the medial branch is omitted continuous prestressed concrete structures as on the construction method of the upper flange and a lower flange and prestressed concrete girders is formed shear key fabricated on the side of the cross beam abuts the flange and flange-mounted on the bottom in the transverse direction of the bridge girder structure and connected by steel girders connecting the longitudinal direction, and has elevated the inner points after the epoxy mortar or a shear key between the longitudinal and transverse directions gap between the abutting girder and the girder to girder to girder charge sikimyeo PC steel tension in the transverse direction After weaving by which the prestressed girders and girders in the transverse direction by lowering the inner point was raised again characterized by introducing the prestressing of the connection to the niche. ; rise of the inner points presented in the invention and Plates of continuous prestressed concrete construction method of concrete structures is omitted, which introduces the compression force in connection with the lowering of the bottom plate and concrete structure because it is not so much the number of lower-type pick of the entire bridge structure in bridge structure can be introduced in the prestressed connection There may also allow the behavior of a continuous gyoro. May also be enough to bridge structures that can replace the existing prestressed box girder bridges in each of the fabricated concrete I-girders in the transverse direction by integrating the entire structure had the great torsional rigidity in the field.
机译:本发明提供了一种混凝土楼板,结合压缩力的上升和下降,中间支路被省略了连续的预应力混凝土结构,如上法兰和下法兰的施工方法以及形成预应力混凝土梁的剪力键在横梁侧面制造的结构在桥梁结构的横向方向上紧靠法兰并法兰安装在底部,并通过纵向连接的钢梁连接,并在环氧砂浆或剪力作用下升高了内点纵向和横向之间的关键相邻大梁和大梁至大梁之间的缝隙装料sikimyeo PC横向钢张力编织后,通过降低内点再次提高了预应力大梁和横向大梁的特性通过引入到利基市场的预应力。 ;本发明提出的内在点的增加和省略了混凝土结构的连续预应力混凝土板的建造方法,由于与下部板和混凝土结构的降低有关,因此引入了与降低底板和混凝土结构有关的压缩力。可以在预应力连接中引入桥结构中的整个桥结构的型拾取。这也可能允许连续的陀螺仪的行为。通过整合整个结构,该结构足以在横向上代替每个预制混凝土工字梁中的现有预应力箱梁桥,该结构在现场具有很大的扭转刚度。

著录项

  • 公开/公告号KR20060032967A

    专利类型

  • 公开/公告日2006-04-18

    原文格式PDF

  • 申请/专利权人 PARK YUNG HEE;

    申请/专利号KR20060022932

  • 发明设计人 PARK YUNG HEE;

    申请日2006-03-13

  • 分类号E01D2/00;

  • 国家 KR

  • 入库时间 2022-08-21 21:26:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号