首页> 外国专利> THE CABLE CRANE FOR A CIVIL ENGINEERING AND CONSTRUCTION WORKING

THE CABLE CRANE FOR A CIVIL ENGINEERING AND CONSTRUCTION WORKING

机译:土木工程施工中的电缆起重机

摘要

The present invention includes an engine 11 and the hydraulic pump 12, using the hydraulic motor 13 performing a hoisting drum with drive (14) (15) to a, and the drum 14 is provided with drive unit 15 as a brake (16, 17) with the same spacing mechanism (18) to the brake (10) ; The drive section 10 of the driving drum 15 and the traveling grinding hypothesis that the same device separation mechanism (18) (5A) and a distance gisak (5B) the central chamber, which is installed to maintain the tension (20); The central thread running Isaac (5A) and a distance of 20 gisak (5B), the driving (10) the winding drum 14 winding Isaac (5C) for guiding the guide pulley is part of the hypothesis to 30; Is linked to the drive unit 10 is provided with dozens of frame 41, the lower and the middle portion to form a tower of the drive-side hinge 45, 45 'to 40; Is coupled to the upper portion of the drive-side tower 40 via the guide pulley driving unit 30 is erased (5A) and a distance gisak (5B), the winding Isaac (5C) for guiding the guide pulleys (51, 52, 53 ), and the tower (fixed socket on the ground to support the 40) (35) and, the fifth block tension Isaac (5D) attached to 36 is fixed to the bracket is connected to each other by a pivoting pin head 54 (55 ') coupled to the tension Isaac socket coupled to the mainstay (55) and a reverse side of the tower head bracket (56 to couple mainstay (5E) are connected to each other in the 10th block 75 of 70') socket (56) driving the driving side made of a tower-side head (50) to install the (1); The installation in correspondence to the driving-side tower 40 is provided with several tens of frames (61), inverted to form a hinge (45 ") at the lower side the tower (60); and in the upper portion of the reverse side of the tower (60) Each of the guide pulleys (51, 52, 53) to guide the traveling grinding (5A) and a distance gisak (5B) a guide pulley installed to circulate by connecting the driving side are combined with each other provided on the tower head (50) 71, 72 and hoisting Isaac (5C) and, 10 to be rotated by a stopper (5E) is fixed so as to connect the kingpin (44) is connected to the stopper socket 56 of the driving-side tower head (50) coupled to the primary block 75 and the tower fixed to the ground to support the socket (60, 35 ') and the fifth block 36' Isaac tension bracket (5D) attached to the connection to each other (76 ') The tension Isaac socket 76 to reverse side (2) having a reverse side of the tower head mounting portion (70); characterized by comprising, including ; Accordingly, the present invention, each far After reduction of the hypothesis of the cable between the towers fell 2 renovated using hooks or bucket, cost carriers such as transporting construction materials into power, as well as safe and rapid transport of construction materials and concrete dams or bridges it is effective to perform such as the construction of. ; In addition, by forming the hinge (Hinge) provided in the lower portion of the tower to take to perform a hinge-type role for the 360 direction, and as well as the intermediate If you install the hinge in part by the lower hinge is buried in the earth, and my role is not to take the place of the middle hinge, by fixing the tension in the back Isaac distances by increasing the angle between the tower and the tower dramatically reduce the load on the tower has the effect of.
机译:本发明包括发动机11和液压泵12,其利用液压马达13对驱动器(14)(15)进行起重鼓,鼓14设置有作为制动器(16、17的驱动单元)15。 )具有与制动器(10)相同的间距机构(18);驱动滚筒15的驱动部分10和行进研磨的假设是,相同的装置分离机构(18)(5A)和距离室(5B)位于中央腔室,其安装成维持张力(20);假想中心线运行以撒(5A)与20 gisak(5B)的距离,驱动(10)将卷绕鼓14卷绕以撒(5C)以引导导轮,该假说的一部分为30;连接到驱动单元10的驱动器设置有数十个框架41,其下部和中间部分形成塔架的驱动侧铰链45、45'至40;经由引导轮驱动单元30与驱动侧塔架40的上部(5A)和距离gisak(5B)耦合,用于引导引导轮(51、52、53)的绕线Isaac(5C) ),然后将塔架(固定在地面上的插座支撑40)(35)和附接到36的第五块张力艾萨克(5D)通过枢轴销钉头54(55)相互连接')耦合到与支柱(55)相连的Isaac插座,塔架托架的背面(56耦合支柱(5E)在70'的第10块75中彼此连接)(56)驱动由塔侧头(50)制成的驱动侧以安装(1);对应于驱动侧塔架40的设备在塔架(60)的下侧和后侧的上部设有几十个框架(61),这些框架被翻转以形成铰链(45″)。在塔架(60)的上方设置有用于引导行进磨削(5A)的各引导轮(51、52、53)和通过连接驱动侧而被安装成循环的引导轮(5g)。在塔顶(50)71、72和提升的艾萨克(5C)上,并固定有要通过挡块(5E)旋转的10,以便将主销(44)连接到驱动器的挡块插座56-侧塔头(50)耦合至主模块75,塔架固定在地面上以支撑承窝(60、35')和第五模块36'Isaac拉力托架(5D),它们相互连接(76) ')以艾萨克插座76的反面(2)具有塔顶安装部分(70)的反面;其特征在于,包括ding;因此,本发明在降低了塔架之间的电缆的假设之后,每两年下降一次。使用钩子或铲斗进行了翻新,成本承运人例如将建筑材料运输为动力,以及安全快速地运输建筑材料和混凝土大坝。或搭桥是有效的,例如建造。 ;另外,通过形成在塔架下部提供的铰链(Hinge)来承担360方向的铰链型作用,以及中间部分如果通过下部铰链安装埋在泥土中,我的作用不是代替中间铰链,通过固定后方以撒拉力的距离来增加塔架与塔架之间的夹角,大大降低了塔架上的负荷。

著录项

  • 公开/公告号KR20060054732A

    专利类型

  • 公开/公告日2006-05-23

    原文格式PDF

  • 申请/专利权人 KOREA ROPEWAY CO. LTD.;

    申请/专利号KR20040093404

  • 发明设计人 CHOI SOO JIN;

    申请日2004-11-16

  • 分类号B66C21/00;B66C11/16;

  • 国家 KR

  • 入库时间 2022-08-21 21:25:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号