首页> 外国专利> CONNECTION DETAIL AND ITS CONSTRUCTION METHOD BETWEEN ABUTMENT AND STEEL GIRDER IN INTEGRAL ABUTMENT BRIDGE

CONNECTION DETAIL AND ITS CONSTRUCTION METHOD BETWEEN ABUTMENT AND STEEL GIRDER IN INTEGRAL ABUTMENT BRIDGE

机译:整体式承力梁桥索钢梁连接细节及其构建方法

摘要

The present invention removes the bearings and expansion joints and bridge construction as a monolithic integrated superstructure and abutment in the junction structure of alternately passing the load from the steel girder and the superstructure of the bridge on the basis of rotation , an upper end side of the steel girders embedded in the shift and / or a lower flange with a plurality vertically and the upper and lower flanges holes on both sides or one side of the plurality of the one side and in an open hole or holes in combination with an open hole , which is characterized in that the perforated plate is welded .
机译:本发明去除了轴承和伸缩缝以及桥梁结构,其为整体结构的上部结构和桥基,其在旋转的基础上交替地传递来自钢梁的载荷和桥梁上部结构的交接结构,该上部结构是桥的上端。嵌入移位和/或下部凸缘的钢桁架,在多个一侧的两侧或一侧上有多个垂直的上下凸缘孔,并在一个或多个开口的孔中,其特点是穿孔板是焊接的。

著录项

  • 公开/公告号KR20060058600A

    专利类型

  • 公开/公告日2006-05-30

    原文格式PDF

  • 申请/专利权人 YOU SUNG KUN;KIM YOUNG HO;

    申请/专利号KR20040097707

  • 发明设计人 YOU SUNG KUN;KIM YOUNG HO;JUNG JAE HO;

    申请日2004-11-25

  • 分类号E01D19/02;

  • 国家 KR

  • 入库时间 2022-08-21 21:25:37

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号