首页> 外国专利> STRESS RELEASE SYSTEM FOR REPAIRING AND REINFORCING STEEL STRUCTURE CONNECTION

STRESS RELEASE SYSTEM FOR REPAIRING AND REINFORCING STEEL STRUCTURE CONNECTION

机译:修补和加固钢结构连接的应力释放系统

摘要

the present invention is a steel member joint repair, reinforce the tensile stress relief system for dead on about that, flat on both sides receiving in which a plurality of holes 15 are formed in the iron plate 11, the rod insertion hole in the center (14) is formed and the backing steel plate (11) pressure iron plate 13 and which is provided on one side of the one side, the iron plate pressure ( 13) on both sides of the pressure griddle 13 for supporting a steel plate being made of a support 12 which is welded to a steel plate to the pedestal 11, the bracket 10, and; The threads are formed on both sides of PC steel bar (16) provided; And a nut (18) is coupled to one side of the threaded PC steel bar (16); And special nut (19) in which a plurality of fastening holes (19a) are formed on the outer peripheral surface is coupled to the other side periphery of said PC threaded bar (16); Provided to secure the bracket 10 to the flange (1) and the washers 21 and the nut 22 is fastened is known of high strength bolts (20) and; Cylindrical body 24 is provided, the straw 25 is moveable by a hydraulic pressure to one side of the body 24 is provided, which penetrate into the inside of the body 24 at the central portion of the straw (25) center hole 26 is formed, the hydraulic inlet (27) is provided with a center hole jack 23 and to one side of the straw (25); The center hole jack 23 and the bracket to secure the space between the opening 10 of the pressure iron plate (13, 29) are formed on the outer peripheral surface side, to support the end portion of the jack center hole jack 23 mounting portion 30 is formed jack stand (28); The thread is formed on both sides, the center hole jack 23 and the connecting rod 31 and is provided to connect the PC steel bar (16); A plurality of holes in the outer circumference tank for delegation (32a) is formed on the inner peripheral surface, the threads formed on the peripheral, the PC steel bar (16) and the connecting rod 31, a connection is provided to connect to the socket (32) and; The connecting rod 31 and the straw 25 which is provided so as to be supported firmly connecting rod fixing nut to the tip 33 of the center hole jack 23; The special nut (19) fitted with the pressure in the tank delegation hole (19a) (32a) formed on the outer circumference of the connection socket (32) which is provided to tighten or solve the special nut 19 and the connection socket (32) characterized by comprising a rod (34). ; invention steel member connection maintenance, a further feature of the dead load tensile stress relief system for reinforcing the said flanges in order to install the bracket (10), ( 1) After the completion of the high-strength bolt hole repair (2) such that the flange reinforcement is perforated in (1) is coupled to the upper and lower surfaces of the high strength bolts 20 and nuts (the flange (1) by tightening of 22), on both sides a plurality of fastening holes (35a) is characterized in that the reinforcement is formed of iron plate 35 is further provided. ; Thus, the bracket so that the defect of the structure symmetrical to the flange (1) of the generated connection ( 10) is provided, and the bracket 10 to the PC steel bar (16) is installed, connected for PC tension bar (16) on one side of the PC steel bar (16) the socket 32, the jack stand 28, the center Jack holes 23, a connecting rod lock nut 33 is installed and introduced in the flange (1), as the introduction of the compressive stress of the tensile stress by as much as the size of a PC steel bar (16) by a PC steel bar strain 16 a tensile stress PC steel bar (16) is fully shared flange (1) is removed the tensile stress is introduced in the flange (1) of the connection in a secure state the tensile stress is removed, introduced into the conservative, reinforcement may be made and the configuration of the tensile stress relief system is relatively simple, and its installation and disassembly can be done quickly and easily with the installation because the event who, unlike conventional steel member joint repair, as well as the reduction of the construction period of the reinforcement, the breakthrough of the cost This reduction has the advantage of including possible termination.
机译:本发明是一种钢制构件的接头修理,加强了用于消除死角的拉应力消除系统,在两侧平坦地容纳在铁板11上形成有多个孔15的中心的杆插入孔(形成如图14所示的结构,并且在该一侧的一侧上设置有背板钢板(11),该背板钢板(11)形成在用于支撑钢板的压力烤架13的两侧上的钢板压力(13)。支撑件12,其被焊接到底座11的钢板上,支架10,以及;螺纹形成在所提供的PC钢筋(16)的两侧;螺母(18)连接到螺纹PC钢筋(16)的一侧;并且,在所述PC螺纹杆(16)的另一侧的周缘上连接有在其外周面上形成有多个紧固孔(19a)的专用螺母(19)。已知将高强度螺栓(20)用于将托架10固定到凸缘(1)和垫圈21上并且紧固螺母22。设置有圆筒状的主体24,通过水压可移动的吸管25被设置在主体24的一侧,该吸管25在形成有吸管25的中心孔26的中央部处渗透到主体24的内部。液压入口(27)在吸管(25)的一侧设有中心孔千斤顶(23)。中心孔千斤顶23和用于固定压力铁板13、29的开口10之间的空间的支架形成在外周表面侧,以支撑千斤顶中心孔千斤顶23安装部30的端部。形成插孔架(28);螺纹形成在中心孔千斤顶23和连杆31的两侧,并且设置成连接PC钢筋16。在内周表面上形成有多个用于委派的外周槽(32a)中的孔,在外周上形成的螺纹,PC钢棒(16)和连杆31被提供以连接至插座(32)和;连杆31和吸管25被设置成被牢固地支撑,将连杆固定螺母连接到中心孔千斤顶23的尖端33;专用螺母(19)与在连接插座(32)的外圆周上形成的油箱放气孔(19a)(32a)中的压力相匹配,该螺母用于紧固或解决专用螺母19和连接插座(32) )的特征在于包括杆(34)。 ;发明钢构件的连接维护,静载荷拉伸应力释放系统的另一个特征是用于加固所述法兰,以便安装支架(10),(1)在完成高强度螺栓孔修复之后(2)在(1)中穿孔的法兰加强件连接到高强度螺栓20和螺母(通过拧紧22而使法兰(1))的上下表面,在两侧上有多个紧固孔(35a)其特征在于,进一步设置有由铁板35形成的加强件。 ;因此,提供了支架,以提供与所产生的连接件(10)的凸缘(1)对称的结构缺陷,并且将支架10安装到PC钢筋(16),用于PC张力杆(16)。 )在PC钢筋(16)的一侧上,将插座32,千斤顶支架28,中心千斤顶孔23,连杆锁紧螺母33安装并引入法兰(1)中,以引入压缩力通过PC钢筋应变16使拉伸应力的应力达到PC钢筋(16)的大小,拉伸应力PC钢筋(16)被完全共享的法兰(1)去除,从而将拉伸应力引入处于固定状态的连接法兰(1)消除了拉应力,引入了保守状态,可以进行加固,并且拉应力消除系统的配置相对简单,可以快速进行安装和拆卸,并且容易与安装,因为该事件谁,与常规不同l钢构件的联合修理,以及减少了钢筋的建设工期,突破了成本。这种减少具有包括可能终止的优点。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号