The present invention after assembling line the nose pingbu reinforced network of piers from the ground, lifted by a crane and piers pillar upper part of the pier columns reinforced the nose pingbu pillars reinforced pier one to install a coping and mechanically connected to the nose pingbu landline assembly process relates to, one shares to 4 stocks in the pier nose pingbu assembly process of the bridge, pillar installation steps to install the pillars protrude the top of the pier pillar rebar is installed on the pillars of the pier to the outside formwork to form a coping wealth appearance for the installation and install the the nose pingbu having a nose pingbu pillar reinforcement protruding downward to be connected to the pier pillar rebar reinforcement mesh using a reinforced network assembly for assembly steps for assembling on the ground, and dies on a pole on the other hand, the nose connect the pingbu the bottom of the net to lift the nose pingbu reinforced pillars and piers reinforced pillars and reinforced by its technical features that made the connection steps for installing a reinforced nose pingbu net on a pole. ; Piers, nose pingbu, cranes, assembly
展开▼