bridge and construction process with integral pier-type mixed abutment

机译:整体墩式混合基台的桥梁与施工工艺

摘要

In as reinforced soil retaining walls and configure complex alternating bridge formed by the piers, the flexibility of the pillars of the piers in bending than the axial stiffness of the member is formed by a large reinforced concrete multi-casting ductile columns and the first and second pier coping portion annual formed of a ganggyeol structure integrating the pier and an upper girder and the upper slab and poured into ever construction method, and connect the slab even as to form as an integral to the chest wall portions of the pier construction, a conventional normal shift, integral alternately, remove the shortcomings of complex shifts and benefits are collected by, and essentially remove the bridge bearings and upper slab and expansion joints connecting the pier coping for supporting the upper girder to the pier, speed of construction of the complex shift bridges and air improve the workability and, sikimyeo while improving the structural safety and durability of bridges extending the life of the bridge, reducing also the maintenance of the bridge details, increase cost-effectiveness, and (高) securing shifts of safe is easy and the safety of the chest wall structure increase US, it improves the running properties of the vehicle for driving the bridge and can reduce the noise and, ultimately, economy and workability is excellent, yet the performance is also superior to monolithic composite shift bridge and its construction that can activate the application of the composite alternating bridge to provide a method. ; Bridges, piers, monolithic composite shifts, flexible pillars, copings, the top girder, top slab, the slab connection
机译:在作为钢筋混凝土挡土墙并配置由墩形成的复杂的交替桥的过程中,墩柱的挠曲性大于构件的轴向刚度,是由大型钢筋混凝土多铸延性柱以及第一和第二挠性柱形成的。传统上,由将码头与上梁和上板结合成一体的ganggyeol结构形成的码头应对部分,浇筑到以往的施工方法中,并且将板连接成一体,成为码头施工的胸壁部的一部分。正常换档,交替进行,消除了复杂换档的缺点,并从中受益,并且从根本上消除了连接支墩顶盖以支撑上梁到墩的桥梁支座和上平板和伸缩缝,复杂换档的建造速度桥梁和空气改善了施工性,同时提高了桥梁的结构安全性和耐用性g延长了桥梁的使用寿命,还减少了桥梁细节的维护,提高了成本效益,并且(高)易于确保安全转移,并且胸壁结构的安全性提高了US,改善了车辆的行驶性能用于驱动桥,并且可以降低噪声,并且最终,经济性和可加工性优异,但是性能也优于整体式复合变速桥及其构造,该结构可以激活复合交替桥的应用,从而提供一种方法。 ;桥梁,墩台,整体式复合移位,柔性柱,顶盖,顶梁,顶板,板连接

著录项

  • 公开/公告号KR100548911B1

    专利类型

  • 公开/公告日2006-02-02

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030020997

  • 发明设计人 최승훈;이윤식;이춘영;조영호;

    申请日2003-04-03

  • 分类号E01D19/02;E01D19/00;

  • 国家 KR

  • 入库时间 2022-08-21 21:24:21