首页> 外国专利> METHOD FOR LEAK-PROOFNESS CHECK OF AUTOPILOT UNIT OF GUIDED ARTILLERY PROJECTILES AND DEVICE FOR ITS REALIZATION

METHOD FOR LEAK-PROOFNESS CHECK OF AUTOPILOT UNIT OF GUIDED ARTILLERY PROJECTILES AND DEVICE FOR ITS REALIZATION

机译:制导炮弹自动驾驶仪防泄漏检查方法及装置的实现

摘要

FIELD: guided artillery projectiles and missiles.;SUBSTANCE: the autopilot unit in the off-state with the controls folded inside its body is preliminarily installed on an installing table covered with electroconducting rubber. The controls are closed with sealing shields. A protective clamp is fitted on the unit outer surface, and in-process handling cross-pieces are installed. Then, the cross-pieces of the ignition circuits are removed, the resistance of the autopilot unit circuits and the insulation resistance of the electrically insulated circuits of the autopilot unit are measured for compliance with the required ones, and the unit leak-proofness is checked. To this end, the unit is installed in an in-process handling fixture providing leak-proofness of the fixture covers on the side of the unit end surfaces, the clamp is shifted to the out-of-shields position, the unit is connected through the in-process handling hole in its body with the aid of a flexible tube to the compressed air source with a pressure gauge and a release safety valve installed in it, air is injected in the unit body up to the positive pressure, the unit is immersed in a reservoir with water having a temperature of normal climatic conditions for a time of not less than the preset holding time, and air is injected in the unit body to the positive pressure. Visual indication of air leakage from the unit body is performed during the preset holding time by air bubbles and by a change of the pressure, the pressure is smoothly decreased to a value determined by the safety engineering, the unit is extracted from the reservoir, moisture is removed, the pressure is zeroed, and the unit is disconnected from the compressed is source, then a stopper is installed on the in-process handling fixture in the unit body, the clamp is shifted to the middle position of the shields in height, the fixture covers are removed, and the unit is installed on the table. The cross-pieces of the ignition circuits are removed, the resistance of the electric circuits and the insulation resistance of the unit insulated circuits are measured, the cross-pieces of the ignition circuits are installed, and a decision on fitness of the autopilot unit as far as the leak-proofness is concerned is taken by the results of the check of absence of air bubbles, absence of pressure drop and stability of the results of resistance measurement. The device has the respective components for realization of the method.;EFFECT: enhanced self-descriptiveness and truth of the check.;7 cl, 1 dwg
机译:领域:制导炮弹和导弹。实质:自动驾驶装置处于关闭状态,其内部折叠有控件,该装置已预先安装在覆盖有导电橡胶的安装台上。控制装置用密封罩封闭。在设备外表面安装了保护夹,并安装了处理中的横档。然后,取下点火电路的横档,测量自动驾驶仪单元电路的电阻和自动驾驶仪单元的电气绝缘电路的绝缘电阻,以使其符合要求,并检查单元的防漏性。为此,将单元安装在过程中的固定装置中,以提供固定装置盖在单元端面侧面的防漏性,将夹具移至屏蔽外位置,通过以下方式连接单元借助一个带压力表和释放安全阀的压缩空气源的挠性管在其主体中的过程中处理孔,将空气注入单元主体直至达到正压,该单元将其浸入具有正常气候条件温度的水的容器中不少于预设保持时间的时间,然后将空气注入到单元体内达到正压。在预设的保持时间内,通过气泡和压力的变化,可以直观地指示出从机体内漏出的空气,并通过压力变化将压力平稳降低至安全工程确定的值,并从储液罐中抽出设备,水分移除,压力归零,然后将设备与压缩源断开连接,然后将塞子安装在设备主体中的过程中处理夹具上,将夹子的高度移到屏蔽的中间位置,卸下固定盖,然后将设备安装在桌子上。去除点火电路的横档,测量电路的电阻和单元绝缘电路的绝缘电阻,安装点火电路的横档,并确定自动驾驶仪的适用性为就防漏性而言,应通过检查是否存在气泡,是否存在压降以及电阻测量结果是否稳定来进行。该设备具有用于实现该方法的各个组件。效果:增强了自我描述性和检查的真实性; 7 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号