首页> 外国专利> METHOD FOR SECONDARY PRODUCTIVE FORMATION EXPOSING BY SLOT HYDRAULIC JET PERFORATION AND WELL PUTTING IN OPERATION

METHOD FOR SECONDARY PRODUCTIVE FORMATION EXPOSING BY SLOT HYDRAULIC JET PERFORATION AND WELL PUTTING IN OPERATION

机译:缝液压射流射孔二次注采作业方法及钻井作业方法

摘要

FIELD: oil and gas industry, particularly oil and gas production with the use of perforators using direct fluid action, for instance abrasive jets.;SUBSTANCE: method involves performing full-waveform logging along with full wave signal recording in digital form; detecting place and number of cuts performed by hydraulic jet perforation along formation height. Bottomhole assembly includes hydraulic jet perforator, pressure test unit having socket for drop ball receiving, pipe string with measuring band connected to the first clutch and provided with cut marks, as well as reference connection pipe. Above components are arranged in bottom-up direction. Pipe string provided with equipment is lowered in well so that perforator reaches level of lower cut, which is the first from bottom. Then the first slot-like cut is formed in two stages by supplying abrasive liquid to perforator. At the first stage perforation is carried out under working pressure of up to 20 MPa for not more than 25 min. Just after that the second stage perforation operation is carried out under working pressure of up to 30 MPa for not more than 20 min. Above operations are fulfilled for each cut. After the last cut perforation channels of hydraulic jet perforator nozzles are closed and perforator valve assembly is opened. Slot-like channels are cleaned of sand. Perforator is lowered to well bottom and well is flushed until clean formation water appears. Then inflow stimulation liquid in injected into perforation interval and into area located 50-100 m over the perforation interval and repeated full-waveform logging of the inflow stimulation liquid is executed along with full wave signal recording in digital form. Perforator is lifted to day surface. After than immersed pump or equipment for flowing well operation are lowered in producing well or working agent injection equipment is lowered in injection well. Inflow stimulation liquid is removed from well bore and the well is brought into operation.;EFFECT: increased efficiency of secondary productive formation exposing.
机译:技术领域:石油和天然气工业,特别是通过使用直接流体作用的射孔器,例如研磨剂射流,来生产油气。沿地层高度检测水力射孔的位置和数量。井底组件包括液压射孔器,压力测试单元和参考连接管,压力测试单元具有用于接收落球的插座,带有连接至第一离合器并带有切口的测量带的管柱。上面的组件按自下而上的方向排列。随设备一起提供的管柱被降低到井中,以便射孔器达到下切高度,这是从底部开始的。然后,通过向射孔器供应研磨液,分两个阶段形成第一槽状切口。在第一阶段,射孔是在最高20 MPa的工作压力下进行不超过25分钟。在此之后,第二阶段的射孔操作要在最高30 MPa的工作压力下进行不超过20分钟。每次切割均完成上述操作。在液压喷嘴射孔器喷嘴的最后切割的射孔通道关闭后,射孔器阀组件打开。槽状通道已清除沙子。将射孔器降低至井底并冲洗井直到出现干净的地层水。然后,将注入的注入刺激液注入到射孔间隔和射孔间隔内位于50-100 m的区域中,并以数字形式记录全波信号,并重复进行注入刺激液的全波形记录。穿孔器被提起至日间地面。然后在生产井中降低浸没式泵或用于流动井操作的设备,或者在注入井中降低工作剂注入设备。从井筒中除去流入的增产液并使井投入运行。效果:提高了第二生产地层暴露的效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号