首页> 外国专利> Wind energy plant`s function testing method, involves generating control signals for actuators of plant, and modeling actual values by simulation unit for predetermined output conditions, where values are produced for control signals

Wind energy plant`s function testing method, involves generating control signals for actuators of plant, and modeling actual values by simulation unit for predetermined output conditions, where values are produced for control signals

机译:风能设备的功能测试方法,包括为设备的执行器生成控制信号,并通过模拟单元对预定输出条件下的实际值进行建模,在其中为控制信号生成值

摘要

The method involves reading actual values of units of a wind energy plant and generating control signals for actuators of the plant. Performance of the units is indicated, where the signals lie in an input of a simulation unit (45) and the values lie in an output of the unit. The actual values for the unit are modeled by the simulation unit for predetermined output conditions, where the values are produced for the control signals. An independent claim is also included for a system for functional testing of a wind energy plant.
机译:该方法包括读取风能设备的单位的实际值并生成用于该设备的致动器的控制信号。指示了这些单元的性能,其中信号位于模拟单元(45)的输入中,而值位于该单元的输出中。模拟单元针对预定的输出条件对单元的实际值进行建模,在此为控制信号生成值。还包括用于风能设备功能测试系统的独立权利要求。

著录项

  • 公开/公告号DE102004056223A1

    专利类型

  • 公开/公告日2006-05-18

    原文格式PDF

  • 申请/专利权人 NORDEX ENERGY GMBH;

    申请/专利号DE20041056223

  • 发明设计人 SCHUBERT THOMAS;HESTER ROBERT;

    申请日2004-11-17

  • 分类号F03D7;

  • 国家 DE

  • 入库时间 2022-08-21 21:20:38

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号