COLLAPSE PREVENTION CONSTRUCTION METHOD FOR DIKE

机译:堤防塌方施工方法

摘要

PROBLEM TO BE SOLVED: To provide a collapse prevention construction method for a dike for preventing an underground obstacle from affecting construction work, dispensing with a feasibility study to be conducted prior to construction work, and applicable to almost all the dikes of rivers.;SOLUTION: Vertical holes having fixed depth are drilled at an interval set in a core part of a dike body of a river by a full turn all-casing drill, a tremie pipe is inserted into all-casing in the vertical hole, and cement improved agent is charged through an opening part at its upper end to construct a first pile. A third pile is constructed in a central part between the first pile and a second pile. A fourth pile overlapping on each pile adjacent to a central part between the first pile and the third pile partially is constructed. Lastly, a fifth pile overlapping on each pile adjacent to a central part between the second pile and the third pile partially is constructed to construct a cast-in-place pile wall in the ground.;COPYRIGHT: (C)2007,JPO&INPIT
机译:要解决的问题:提供一种堤防预防倒塌的施工方法,以防止地下障碍物影响施工,并放弃在施工之前进行的可行性研究,并且几乎适用于所有河流堤防。 :用全转全套管钻在一定间隔的深度上以一定间隔钻入一定深度的垂直孔,该固定孔在河流的堤防主体中,将特雷米管插入垂直套管的全套管中,并使用水泥改良剂通过在其上端的开口部分装料以构造第一桩。在第一桩和第二桩之间的中心部分构造第三桩。构成第四桩,该第四桩在与第一桩和第三桩之间的中心部分相邻的每个桩上重叠。最后,在与第二个桩和第三个桩之间的中心部分相邻的每个桩上重叠放置一个第五桩,以在地下构造现浇桩壁。版权所有:(C)2007,JPO&INPIT

著录项

  • 公开/公告号JP2007231641A

    专利类型

  • 公开/公告日2007-09-13

    原文格式PDF

  • 申请/专利权人 DAIYO KENSETSU KK;

    申请/专利号JP20060055555

  • 发明设计人 MINE GORO;

    申请日2006-03-01

  • 分类号E02B3/10;

  • 国家 JP

  • 入库时间 2022-08-21 21:16:13