首页>
外国专利>
LATTICE POINT CONSTRUCTION METHOD (WOODEN CLOGS CONSTRUCTION METHOD) AND CYLINDER
LATTICE POINT CONSTRUCTION METHOD (WOODEN CLOGS CONSTRUCTION METHOD) AND CYLINDER
展开▼
机译:格点构造法(木LOG构造法)和圆筒
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To enable to realize a 300 m class superhigh-rise by utilizing this proposal lattice point construction method as a foundation method for a 300 m class superhigh-rise building with a proper increase of foundation construction cost.;SOLUTION: This proposal of lattice point construction method is constituted by constructing a first foundation mat and a second foundation mat with 10 m interval at the depth of GL-40 m of the two foundation mats, by arranging a suspension cylinder (S) and a damper cylinder (D) with a proper spacing between the first foundation mat and the second foundation mat, by arranging soft soil between the cylinders and by solidifying with a proper pounding.;COPYRIGHT: (C)2007,JPO&INPIT
展开▼