METHOD FOR OVERHAULING AND CONSTRUCTING BLAST FURNACE

机译:高炉大修和施工方法

摘要

PROBLEM TO BE SOLVED: To provide a method for overhauling and constructing a blast furnace with which the shortage of work term of overhauling work and the constructing work for blast furnace and improvement of safety can be obtained.;SOLUTION: A furnace top structure and a furnace body block positioned at the upper step are hung up on the blast furnace foundation 6 and after cutting off the furnace top structure and the furnace body block from the lowest step of the furnace body block in order, the above furnace top structures and the above furnace body blocks are laid on the blast furnace foundation with a transferring table on the blast furnace foundation. Then, after laying, these overhauled materials are shifted to a furnace body transporting carriage 5 for setting a laying level adjusting structure so as to match to the level of the blast furnace foundation and transported to an overhauling place with the furnace body transporting carriage.;COPYRIGHT: (C)2007,JPO&INPIT
机译:要解决的问题:提供一种高炉的检修和建造方法,利用该方法可以弥补检修工作的工期和高炉的建造工作的不足,并提高安全性。将位于较高台阶处的炉体块悬挂在高炉基础6上,并且从炉体块的最下层依次切除炉顶结构和炉体块之后,上述炉顶结构和上述炉体块放置在高炉基础上,高炉基础上有一个转移台。然后,在铺设之后,将这些大修后的材料转移到炉体运输车5,以设置铺设高度调节结构,以使其与高炉基础的高度相匹配,并与炉体运输车一起运输到大修位置。版权:(C)2007,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号