PROBLEM TO BE SOLVED: To reduce manufacturing costs of a precast concrete (PC) panel zone and the number of man-hours for the PC panel zone, reduce the amount of grout to be injected, and improve working efficiency during the injection of the grout.;SOLUTION: In a construction method for joining the PC panel zone (1) with a lower column member, the panel zone (1), through which a reinforcement inserting hole (3) passes in a vertical direction, is erected on a concrete column member (10), from which a main reinforcement (11) is protruded upward, via a spacer (12) in such a manner that the main reinforcement (11) is inserted into the hole (3); grout fixing (13) is applied to an outer peripheral part of a joint space between the panel zone (1) and the column member (10), which is formed by using the spacer (12); and after that, the grout (G) is simultaneously injected into the joint space and a gap between the hole (3) and the main reinforcement (11) in one process, so that the panel zone (1) and the lower column member can be integrally joined together. The grout (G) is injected through the hole (3) into which the main reinforcement (11) is inserted.;COPYRIGHT: (C)2004,JPO
机译:要解决的问题:减少预制混凝土(PC)面板区域的制造成本和PC面板区域的工时,减少要注入的灌浆量,并提高灌浆过程中的工作效率解决方案:在用于将PC面板区域(1)与下柱构件连接的施工方法中,将面板区域(1)竖立穿过钢筋插入孔(3)穿过混凝土区域(1)柱状构件(10),主加强件(11)经由间隔件(12)从该构件向上突出,使得主加强件(11)插入孔(3)中;在面板区域(1)与柱构件(10)之间的接合空间的外周部,使用隔片(12)形成灌浆固定件(13)。然后,在一个步骤中将水泥浆(G)同时注入到连接空间以及孔(3)和主钢筋(11)之间的间隙中,从而使面板区域(1)和下柱构件能够成为一体灌浆(G)通过孔(3)注入,主钢筋(11)插入孔中;版权所有:(C)2004,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号