Pressing in underground excavation construction method and the subterranean structure construction construction method null cartridge
Pressing in underground excavation construction method and the subterranean structure construction construction method null cartridge
展开▼
机译:压入式地下工程施工方法及地下结构施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To enhance the efficiency of transporting the earth and sand excavated and to make it easy to dispose of the earth and sand by allowing water-bearing earth and sand excavated to drain naturally. SOLUTION: A cylindrical sunk element 1 is pressed into the ground 3 and sunk in position, and a cylindrical temporary element 2 having a smaller diameter than the sunk element 1 is pressed into the ground 3 inside the sunk element 1. Subsoil between the sunk element 1 and the temporary element 2 is excavated by a bucket 4, and the earth and sand 5 excavated are dumped into the temporary element 2 and left there for a while. After a predetermined time has elapsed since the dumping, the earth and sand 5 dumped are discharged to the outside of the temporary element 2 and conveyed by a dump truck, etc. Therefore, the earth and sand 5 left inside the temporary element 2 are allowed to drain naturally by the force of gravity, the amount of water contained in the earth and sand 5 decreases, and the weight of the earth and sand per unit volume decreases. A hole 6 excavated is used in the construction of a foundation pile.
展开▼