首页> 外国专利> River flood control for embankment

River flood control for embankment

机译:堤防河道防洪

摘要

PROBLEM TO BE SOLVED: To provide a dam body which reduces load to a natural environment as it does not normally obstruct the flow of water in a river requiring water to be controlled by dams and shuts off the flow of the river only when the river is swollen by heavy rain, etc.;SOLUTION: The dam body for river control comprises a plurality of anchors 11, a plurality of membranes (blocking members) 12, and revetments 13, with the anchors 11 and the membranes 12 installed at intervals from an upstream point to a downstream point of an area where the water of the river flows. The revetments 13 have upper end faces 14 and wall surfaces 15 and are installed on both sides of the river. With respect to the installation position of one of the anchors 11, the other anchor 11 is disposed to form a pair on the upper end face 14 of the opposite revetment 134 across the river and along width direction. Each membrane 12 is stretched between the pair of anchors 11.;COPYRIGHT: (C)2004,JPO
机译:要解决的问题:提供一种能减轻自然环境负荷的大坝体,因为它通常不会阻碍河流中的水流,而这需要水坝控制水流,并且仅当河流处于水流中时才切断水流。解决方案:用于河流控制的大坝主体包括多个锚11,多个膜(阻挡构件)12和护岸13,其中锚11和膜12间隔一定距离安装河流的水流区域的上游点至下游点。护岸13具有上端面14和壁表面15,并且被安装在河流的两侧。关于一个锚固件11的安装位置,另一个锚固件11被布置成在相对的护岸134的上端面14上沿河流并沿宽度方向成对地形成。每个膜片12在一对锚固件11之间拉伸。版权所有:(C)2004,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号