首页> 外国专利> How to control the CVT speed ratio

How to control the CVT speed ratio

机译:如何控制CVT速比

摘要

PROBLEM TO BE SOLVED: To adjust a rapid output/input ratio as the slide of the belt of a continuously variable transmission is prevented from occurring.;SOLUTION: Primary and secondary pulleys operated at primary and secondary pressures (Pp and Ps), respectively, are provided. The primary and secondary pressures move the pulleys, and generate power to adjust a linkage belt by means of a continuously variable transmission (CVT) to regulate the output/input speed ratio. The method for adjusting the CVT speed ratio is provided with a process to calculate the desired force ratio of a CVT plant. The desired primary and secondary pressures are decided partially based on the desired force ratio, and desired Ps and Pp signals are sent to the CVT plant to control its operation. An actual speed ratio is calculated from the measured value of the input/output speed of the CVT plant. An error signal is generated from the actual speed ratio used when a desired force ratio at a next sample time is calculated, and a desired force ratio is used as a control variable when the output/input speed ratio of the CVT plant is controlled.;COPYRIGHT: (C)2004,JPO
机译:解决的问题:调整快速的输出/输入比,以防止发生无级变速器的皮带滑动;解决方案:初级和次级皮带轮分别在初级和次级压力(Pp和Ps)下运行,提供。初级压力和次级压力使皮带轮运动,并通过无级变速器(CVT)产生动力来调节连杆皮带,从而调节输出/输入速比。用于调节CVT速度比的方法具有用于计算CVT设备的期望力比的过程。期望的一次和二次压力部分地根据期望的力比确定,并且期望的Ps和Pp信号发送到CVT设备以控制其运行。根据CVT设备输入/输出速度的测量值计算出实际速度比。当计算下一个采样时间的期望力比时,从实际速度比产生误差信号,并且当控制CVT设备的输出/输入速度比时,将期望力比用作控制变量。版权:(C)2004,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号