Project planning system and method for accommodating AD HOC requests within a fixed core development cycle

机译:在固定的核心开发周期内适应AD HOC请求的项目计划系统和方法

摘要

A planning system for the planning and management of multiple projects includes an input (122) for entering project information and task information associated with each project. The project information identifies each project as being of a mandatory, nonmandatory, or ad hoc type that arises intermittently and is subject to change. The task information describes each task to be performed by users of the system and an estimated duration of each task. Also included are a work hour calculator (124), an allocation engine (128), a schedule preparation engine (130), a time tracking system (132), and a time imbalance calculator (134). An allocation modification engine (136) reestimates the time required for completing each project based on the actual time spent and current status for each project and reallocates time to eliminate any time imbalance detected by the time imbalance calculator.
机译:用于多个项目的计划和管理的计划系统包括输入( 122 ),用于输入项目信息和与每个项目相关的任务信息。项目信息将每个项目标识为强制性,非强制性或临时类型,这些类型会间歇性地出现并且可能会发生变化。任务信息描述了系统用户要执行的每个任务以及每个任务的估计持续时间。还包括工作时间计算器( 124 ),分配引擎( 128 ),日程准备引擎( 130 ),时间跟踪系统( 132 )和时间不平衡计算器( 134 )。分配修改引擎( 136 )根据实际花费的时间和每个项目的当前状态重新估算完成每个项目所需的时间,并重新分配时间以消除时间不平衡计算器检测到的任何时间不平衡。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号