首页> 外国专利> A method of controlling the direction of propagation of injection fractures in permeable formations

A method of controlling the direction of propagation of injection fractures in permeable formations

机译:控制渗透性地层中注入裂缝传播方向的方法

摘要

The invention relates to a method of controlling the production of oil or gas from a formation ( 1 ) comprising that a first and second drilled production well ( 105, 110 ) are formed next to each other that extend essentially horizontally, that, at the drilled production wells, a further drilled well ( 115 ) is formed that extends between the first and the second drilled production well ( 105, 110 ), that the production of oil or gas is initiated, and that, while oil or gas is being produced, a liquid is conveyed to said further drilled well ( 115 ) and out into the formation ( 1 ) for a first period of time TSUB1/SUB. The invention is characterised in that the pore pressure of the formation is influenced during the period TSUB1 /SUBwith the object of subsequently controlling the formation of fractures along a drilled well, typically across large distances in the reservoir. Such influence is accomplished partly by production in adjacent wells, partly by injection at low rate without fracturing in the well in which the fracture is to originate. Injection at low rate presupposes that an at least approximated determination is performed of the maximally allowable injection rate ISUBmax /SUBfor the period TSUB1 /SUBin order to avoid fracturing ruptures in said further drilled well ( 115 ) when liquid is supplied by the injection rate I for the liquid supplied to the further drilled well being kept below said maximally allowable injection rate ISUBmax /SUBfor said first period of time TSUB1 /SUBwhen the relation sigma'SUBhole,min/SUB=sigma'SUBh /SUBhas been complied with.
机译:控制地层(1)的石油或天然气生产的方法技术领域本发明涉及一种控制地层(1)的石油或天然气的生产的方法,该方法包括:彼此相邻地形成基本水平延伸的第一和第二钻探生产井(105、110),该第一和第二钻探生产井(105、110)在生产井中,形成另一钻探井(115),该井在第一和第二钻探生产井(105、110)之间延伸,开始生产石油或天然气,并且在生产石油或天然气时,在第一时间段T 1 中,液体被输送到所述另外的钻井(115)并流出到地层(1)中。本发明的特征在于,在时间段T 1 期间影响地层的孔隙压力,其目的是随后控制沿着钻探井的裂缝的形成,通常沿着储层中的大距离。这种影响部分地通过在相邻井中的生产来实现,部分地通过低速注入而不会在将要引起裂缝的井中压裂来实现。低速注入的前提是,至少要对T 1 期间的最大允许注入速率I max 进行确定,以避免在所述进一步钻探中产生破裂破裂在第一时间段T 1中,当以注入速率I供应液体时,用于供应至另一钻井的液体的井(115)保持在所述最大允许注入速率I max 以下满足关系sigma' hole,min <= sigma' h 时。

著录项

  • 公开/公告号GC0000392A

    专利类型

  • 公开/公告日2007-03-31

    原文格式PDF

  • 申请/专利权人 MERSK OLIE OG GAS AS;

    申请/专利号GC2002P002005

  • 发明设计人 JORGENSEN OLE;

    申请日2002-05-21

  • 分类号E21B43/26;E21B49/00;

  • 国家 GC

  • 入库时间 2022-08-21 20:51:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号