首页> 外国专利> how to remove air during commissioning of the boiler

how to remove air during commissioning of the boiler

机译:锅炉调试期间如何去除空气

摘要

the invention of the first boiler commissioning heating pipe installed in accordance with the number of circulating heating supplements are made discloses a method to remove the air during start-up of the boiler is capable of removing effectively the foam of the air occurring. ; The main configuration of the present invention is the operation of the circulation pump for circulating a number of heating through the heating pipe, When a portion of the three-way valve to the heating operation can be supplied to the room is different from the operation mode according to the installation part is to be stored in the expansion tank of the boiler, for heating when the circulation pump is operating supplemented to make up for the number of heating in the heating pipe in the air during the start-up of the boiler As the air removal method removes sent to the expansion tank included in the number, when the replacement of the heating can be made, the operation start and stop of the three-way valve and the operation start and stop of the circulation pump With the time difference to be characterized by repeated periodically during the entire start-up time.
机译:根据循环加热补充件的数量安装的第一台锅炉调试加热管的发明公开了一种在锅炉启动过程中去除空气的方法,该方法能够有效去除发生的空气中的泡沫。 ;本发明的主要结构是循环泵的操作,该循环泵用于通过加热管循环多个加热,当三通阀的一部分用于加热操作可被供给到房间时,不同于操作模式根据安装部位应存放在锅炉的膨胀罐中,用于补充循环泵运行时的加热,以补充锅炉启动时空气中加热管中的热量除气方法是去除送入编号中包含的膨胀罐的热量,当可以进行加热更换时,三通阀的操作开始和停止以及循环泵的操作开始和停止具有时间差其特点是在整个启动时间内定期重复。

著录项

  • 公开/公告号KR20070033688A

    专利类型

  • 公开/公告日2007-03-27

    原文格式PDF

  • 申请/专利权人 주식회사 경동나비엔;

    申请/专利号KR20050088135

  • 发明设计人 김성엽;이승재;

    申请日2005-09-22

  • 分类号F24H9/20;F24H9;

  • 国家 KR

  • 入库时间 2022-08-21 20:35:58

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号