DOWN-WARD CONSTRUCTION METHOD OF THE UNDERGROUND SLABS AND RETAINING WALLS BY THE SLIM-TYPE COMPOSIT FLOOR SYSTEM CONSISTED OF THE ARCHITECTURAL CONPOSIT DEEP DECK AND UNSYMMETRIC H-BEAM WITHOUT PRELIMINARY WALL-ATTACHED SUPPORT BEAMS AND SUB-BEAMS OF THE FLOOR

机译:不带墙固定支撑梁和分梁的,由建筑组合深层和不对称H型钢组成的薄型复合地板体系的地下楼板和挡土墙的向下施工方法

摘要

The invention basement exterior walls (concrete retaining wall) and H-type file on the middle pillar wall adjacent to the retaining wall purchase, and then go through the asymmetric H-shaped slender beams in these H-type file, dance, performed by digging deep deck plate and at the same time as the asymmetric H-shaped composite slim beam to form a composite floor structure and basement with exterior walls, basement can significantly reduce the floor height, border security and the outer wall of the basement will omit the middle of the floor beams and the floor on thin composite structures and underground station simultaneous placement and simultaneous placement of exterior wall construction method that can significantly shorten the air. ; The present invention includes a first step of forming a retaining wall H-shaped file is embedded at certain intervals along the outer perimeter of the building to be constructed planning unit; A second step of installing the center pillar file location inside the building; A third step of installing underground outer side file location adjacent the retaining wall; A fourth step for applying an teopa to a predetermined depth the part of the earth retaining wall and the center file is to be exposed; The fifth step of the horizontal and vertical directions H Beam H Beam Beam installation files between the center and side files; The sixth step of forming a slab at the bottom of the dancing ground plan of the transverse H Beam install a deep deck plate; And further comprising a seventh step the outer wall and the basement to the co-casting and the slab concrete curing to form a composite floor structure, wherein the gihayeo teopa sequentially repeated and, at the same time to a predetermined depth to form the continuous phase before the predetermined lower level, and the lowest provides a thin composite floor system with simultaneous placement and underground backhand simultaneous installation of exterior wall construction method characterized in that it performs the floor and foundation.
机译:本发明的地下室外墙(混凝土挡土墙)和H型锉在与挡土墙相邻的中间柱壁上购置,然后经过这些H型锉中不对称的H形细长梁,通过挖掘进行舞蹈深层甲板板和不对称的H形复合细梁同时形成带有外墙的复合地板结构和地下室,地下室可显着降低地板高度,边界安全,地下室的外壁将省略中间在薄的复合结构和地下车站上同时布置和同时布置外墙的地板梁和地板的施工方法,可以大大缩短空气。 ;本发明包括第一步,形成一挡墙,将H形锉沿要建造的建筑规划单元的外周以一定间隔嵌入。在建筑物内安装中心支柱文件位置的第二步;第三步,在挡土墙附近安装地下外侧锉刀位置;第四步,将一块teopa施加到预定的深度,以暴露部分挡土墙和中心锉。第五步,水平和垂直方向H梁H梁梁安装在中心和侧面锉之间;在H型横梁的舞池平面图底部形成平板的第六步,安装一块深甲板。并进一步包括第七步骤,将外壁和地下室共同浇铸并平板混凝土固化以形成复合地板结构,其中,依次重复gihayeo teopa并同时达到预定深度以形成连续相在预定的较低水平之前,最低的是提供一种具有同时放置和地下反手同时安装的外墙施工方法的薄型复合地板系统,其特征在于,它执行地板和地基。

著录项

  • 公开/公告号KR20070052109A

    专利类型

  • 公开/公告日2007-05-21

    原文格式PDF

  • 申请/专利权人 KUM DONG SUNG;

    申请/专利号KR20050109750

  • 发明设计人 KUM DONG SUNG;

    申请日2005-11-16

  • 分类号E02D29/045;E04B5/36;E02D29;

  • 国家 KR

  • 入库时间 2022-08-21 20:35:05