首页> 外国专利> CONSTRUCTION METHOD OF SUBMARINE VERTICAL WATERWAY FOR SUPPLYING AND DISCHARGING COOLING WATER FOR INDUSTRIAL FACILITIES UTILIZING JACK UP BARGE AND GUIDE FRAME AND INNER CASING AND CASING CLAMP

CONSTRUCTION METHOD OF SUBMARINE VERTICAL WATERWAY FOR SUPPLYING AND DISCHARGING COOLING WATER FOR INDUSTRIAL FACILITIES UTILIZING JACK UP BARGE AND GUIDE FRAME AND INNER CASING AND CASING CLAMP

机译:利用自升式驳船,导向架及内套管,夹钳向工业设施供排水冷却水的海底垂直水道施工方法

摘要

The present invention relates to a method for constructing a marine vertical sphere for deep intake and drainage of cooling water for industrial facilities using a jack-up barge and a guide frame, and more particularly, to a bottom dredging step, a jack-up barge installation step, and the jack-up barge. Guide frame installation step, installation of steel pipe on the guide frame and fixing the steel pipe and dredging surface, installing the casing clamp on the upper portion of the steel pipe, mounting the excavator to the casing clamp and excavating the dredging surface, the inner of the dredging hole Offshore in the seabed consisting of rock or sandstone layers through the first step of inserting the casing, mortar injection to the outside of the inner casing, cutting the lower end of the steel pipe, excavation of drainage tunnels, mounting of the heavy structure and sandstone reclamation and covering stone laying step Provides methods and equipment for constructing vertical spheres.
机译:本发明涉及一种使用自升式驳船和导向架构造用于工业设施的深水进水和排水的海洋垂直球体的方法,更具体地,涉及一种底部疏step步骤,自升式驳船。安装步骤和自升式驳船。导向架安装步骤,将钢管安装在导向架上并固定钢管和疏ging表面,将套管夹安装在钢管的上部,将挖掘机安装到套管夹上,并挖掘疏the表面,内部第一步:插入套管,向内套管外部注入砂浆,切割钢管的下端,开挖排水隧道,安装重型结构和砂岩开垦和覆盖石铺设步骤提供了构造垂直球体的方法和设备。

著录项

相似文献

  • 专利
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号