首页> 外国专利> METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD

METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD

机译:航向法的隐伏矿床开发方法

摘要

FIELD: mining, particularly methods of underground mining for brown or hard coal.;SUBSTANCE: method involves dividing working area into panels by excavating panel mining, belt and ventilation entries and inclines; performing of advance upper bed mining and retreat lower bed mining; connecting mining entries at different deposit beds with inclines. Belt entries are formed only in lower bed. Mining and ventilation entries made in upper bed are shifted with respect to corresponding lower bed entries for distance equal to half of panel width. As second working fronts of lower and upper beds cross each other excavation of upper beam semi-panel superposed with working panel of lower bed in plan view is stopped up to time of second working front of lower bed moving-off along with lower bed cutting continuing. Upper bed excavation is continued as the second working front of lower bed reaches distance of not less than 0.2 of lower bed depth. Ore is conveyed from upper bed and filling material is supplied to goaf via belt and mining entries formed in excavated adjacent panel correspondingly. Ore from mining entry of upper bed is conveyed to that of lower bed along periodically passable inclines and from mining entry of lower bed to belt entry via ore passes, wherein ore conveyance is began from ore excavated from upper bed. After chamber mining and new incline cutting filling material for mined-out upper bed chamber filling is conveyed. Ore produced from upper bed may be transported by means of conveyer installed in mined-out lower bed chamber. Ore is transferred from mining entry of upper bed to conveyer and in belt entry of mined-out panel via ore passes. Inclines may be arranged transversely to panel entries.;EFFECT: decreased volume of preparatory work and increased cutting rate.;4 cl, 2 dwg
机译:领域:该方法涉及通过挖掘面板开采,皮带和通风口以及倾斜来将工作区域划分为面板;进行提前上层开采和后退下层开采;将不同矿床的采矿入口倾斜。皮带入口仅在下部床中形成。上层床中的采矿和通风入口相对于相应的下层床入口偏移了等于面板宽度一半的距离。当上下床的第二工作前沿彼此交叉时,在俯视图中与下床的工作面板叠置的上梁半面板的挖掘被停止,直到下床的第二工作前沿移开并继续进行下床切割为止。随着下层床的第二工作前沿达到不小于下层床深度的0.2的距离,继续进行上层床的挖掘。矿石从上层床中运出,填充材料通过皮带输送到采空区,并在挖出的相邻面板中形成相应的开采入口。来自上层床的采矿入口的矿石沿着周期性可通过的坡道被输送到下层床的矿石,并且经由矿石通道从下层采矿的入口进入到皮带入口,其中矿石的输送从上层床的矿石开始。在腔室开采和新的倾斜切割填充材料被开采后,用于上层床的腔室填充被输送。由上层床产生的矿石可以通过安装在采空下层床室中的输送机进行运输。矿石从上层床的开采入口转移到输送机,并通过矿石通道在采空区的皮带入口转移。倾斜方向可横向于面板入口布置;效果:减少准备工作量并提高切割速度。; 4 cl,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号