首页>
外国专利>
And construction period calculation method, construction period calculation system
And construction period calculation method, construction period calculation system
展开▼
机译:以及工期计算方法,工期计算系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To easily determine the period of construction work for a building from the architectural area of the building to be constructed, relating to a method for calculating the period of construction work of, e.g., a building.;SOLUTION: For a building to be constructed, its application, the kind of the building structure, information on whether or not the building has basements, and its architectural area to be constructed are inputted from an input device 12. A central processing unit 13 extracts and reads from a storage device 17 regression equations corresponding to a variety of data on the application, the kind of the building structure and information on whether the building has basements, and factors related to the regression equations. The central processing unit calculates the period of construction work on the basis of the read regression equations, the factors and the architectural area.;COPYRIGHT: (C)2004,JPO
展开▼