首页> 外国专利> And construction period calculation method, construction period calculation system

And construction period calculation method, construction period calculation system

机译:以及工期计算方法,工期计算系统

摘要

PROBLEM TO BE SOLVED: To easily determine the period of construction work for a building from the architectural area of the building to be constructed, relating to a method for calculating the period of construction work of, e.g., a building.;SOLUTION: For a building to be constructed, its application, the kind of the building structure, information on whether or not the building has basements, and its architectural area to be constructed are inputted from an input device 12. A central processing unit 13 extracts and reads from a storage device 17 regression equations corresponding to a variety of data on the application, the kind of the building structure and information on whether the building has basements, and factors related to the regression equations. The central processing unit calculates the period of construction work on the basis of the read regression equations, the factors and the architectural area.;COPYRIGHT: (C)2004,JPO
机译:要解决的问题:为了从要建造的建筑物的建筑面积轻松确定建筑物的建造工作周期,涉及一种计算例如建筑物的建造工作周期的方法。从输入装置12输入要建造的建筑物,其应用,建筑物的种类,关于建筑物是否具有地下室的信息以及要建造的建筑面积。中央处理单元13从计算机中提取并读取数据。存储设备17的回归方程式对应于应用程序上的各种数据,建筑物结构的种类以及有关建筑物是否具有地下室的信息,以及与回归方程式相关的因素。中央处理单元根据读取的回归方程,因素和建筑面积计算建筑工期。;版权所有:(C)2004,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号