首页>
外国专利>
Being laying manner of the embedding tube due to the laying manner of the embedding
Being laying manner of the embedding tube due to the laying manner of the embedding
展开▼
机译:由于埋设方式的原因是埋设管的埋设方式
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide an underground pipe laying method for simplifying underground pipe laying work by an open-cut method and shortening work hours.;SOLUTION: A light receiving device 4 is provided at a position which becomes a target construction point in a channel 20 to match an aiming point 425 of a light receiving body 420. A laser irradiation device 3 is provided on an already laid underground pipe 10 to adjust in such a way that laser beams irradiate the aiming point 425. A sand foundation 22 is formed in the channel 20. Jacks 6, 6 are provided on a light receiving device 4 side of the sand foundation 22 and on an underground pipe 10 side. A guide rail 7 is stretched between support plates 61 and 61. Adjustment is performed so that laser beams are irradiated on an aiming point 713 of a light receiving plate 710 by expanding and contracting a column support 60 of the jack 6. A loaded recessed part forming device 8 is mounted on a guide rail 7 and is moved to form a mounting recessed part 220 in the sand foundation 22. An underground pipe 11 is fitted into the mounting recessed part 220 to connect it with the underground pipe 10.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼