首页>
外国专利>
METHOD FOR ARRANGEMENT OF PILE BASEMENT OF BUILDING OR CONSTRUCTION
METHOD FOR ARRANGEMENT OF PILE BASEMENT OF BUILDING OR CONSTRUCTION
展开▼
机译:建筑或建筑桩基的布置方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Method for arrangement of pile basement of building or construction includes immersion of piles to earth, arrangement of grillage with leaving gaps round pile heads, pressing of grillage and earth under it and concreting gaps round pile heads with curing material. To simplify pressing and immersion of elements of basement after arrangement of grillage with leaving gaps round pile heads one first performs erection of building or construction with simultaneous pressing of grillage with weight of building or construction erected. After that one performs additional immersion of piles by means of jack systems that transfer force of pile driving to elements of erected building or construction and after that one performs concreting of gaps round pile heads with curing material.
展开▼