首页> 外国专利> METHOD FOR ARRANGEMENT OF PILE BASEMENT OF BUILDING OR CONSTRUCTION

METHOD FOR ARRANGEMENT OF PILE BASEMENT OF BUILDING OR CONSTRUCTION

机译:建筑或建筑桩基的布置方法

摘要

Method for arrangement of pile basement of building or construction includes immersion of piles to earth, arrangement of grillage with leaving gaps round pile heads, pressing of grillage and earth under it and concreting gaps round pile heads with curing material. To simplify pressing and immersion of elements of basement after arrangement of grillage with leaving gaps round pile heads one first performs erection of building or construction with simultaneous pressing of grillage with weight of building or construction erected. After that one performs additional immersion of piles by means of jack systems that transfer force of pile driving to elements of erected building or construction and after that one performs concreting of gaps round pile heads with curing material.
机译:用于布置建筑物或建筑物的桩基的方法包括:将桩浸入土中,将格栅布置成在桩头周围留有间隙,在其下方压制格栅和土以及用固化材料浇筑在桩头周围的间隙。为了简化格栅布置后地下室元件的压入和浸入,并在圆头桩头之间留有空隙,首先要在竖起格栅或同时竖起具有竖立建筑物或建筑重量的格栅的同时进行建筑物的建造。此后,人们通过千斤顶系统将桩子进一步浸入水中,该千斤顶系统将打桩机的力传递到竖立的建筑物或结构的元件上,然后,人们用固化材料对桩头周围的缝隙进行浇筑。

著录项

  • 公开/公告号UA81293C2

    专利类型

  • 公开/公告日2007-12-25

    原文格式PDF

  • 申请/专利权人

    申请/专利号UAA200508429

  • 发明设计人

    申请日2005-08-30

  • 分类号E02D27/12;

  • 国家 UA

  • 入库时间 2022-08-21 20:06:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号