A construction method of a steel fiber reinforced retaining wall is provided to improve economical efficiency by performing installation work in a short period of time, and to maintain solidity and safety and to prevent the differential subsidence and plastic deformation of the foundation ground by collecting water using a downstream water discharge pipe, a downstream water collection perforated pipe and inner, outer drain filters and draining off smoothly. A construction method of a steel fiber reinforced retaining wall comprises the steps of: forming a foundation compaction layer(3) by forming a foundation setting portion(2) on the lower part of a cut slope(1) and injecting continuous steel fiber and sand in the foundation setting portion and compacting; spreading a downstream water collection perforated pipe(5) with downstream water discharge pipes(4) on the upper part of the foundation compaction layer to be located right below the cut slope; installing a foundation drain structure by installing a cutting water inflow drain member including a cutting water perforated drainpipe(8) by inner, outer drain filters(6,7) on the upper part of the downstream water collection perforated pipe to be adhered and supported to the cut slope, folding the top of the inner, outer drain filters forming the cutting water inflow drain member toward the inside of the top of the cut slope and fixing with a setting pin(15), and covering and fixing the downstream water collection perforated pipe with the top of the inner, outer drain filters; installing a steel fiber reinforced retaining wall compaction layer(11) by mixing 0.15~0.25 weight percent continuous steel fiber and 99.85~99.75 weight percent sand with extrusion injection on the cut slope; and forming a steel fiber reinforced retaining wall(14) by covering the front of the steel fiber reinforced retaining wall compaction layer with a PVC coating steel wire, forming a fertilizer mixing type vegetation layer(13) with fertilizer mixing type vegetative soil and covering with a PVC coating steel wire.
机译:提供一种钢纤维增强挡土墙的施工方法,以通过在短时间内进行安装工作来提高经济效益,并保持坚固性和安全性,并通过使用集水来防止地基的差异沉降和塑性变形。下游排水管,下游集水多孔管,内外排水过滤器,排水顺畅。钢纤维增强挡土墙的施工方法包括以下步骤:通过在切坡(1)的下部形成基础设置部分(2)形成基础压实层(3),并注入连续的钢纤维和砂土在基础设置部分压实;在地基压实层的上部,将下游集水多孔管(5)与下游排水管(4)一起铺开,位于切割坡度的正下方;通过在下游集水多孔管的上部安装内,外排水过滤器(6,7)来安装包括切割水穿孔排水管(8)的切割水流入排水构件,从而安装基础排水结构,以粘附并支撑到切开斜坡,将内部,外部排水过滤器的顶部向切开斜坡顶部的内部折叠,形成切水流入排水部件,并用定位销(15)固定,并覆盖并固定穿孔的下游集水孔带有内部,外部排水过滤器顶部的管道;通过将0.15〜0.25重量%的连续钢纤维和99.85〜99.75重量%的砂混合并在切口边坡上挤压注入来安装钢纤维增强的挡土墙压实层(11);并通过用PVC涂层钢丝覆盖钢纤维增强的挡土墙压实层的前部,形成钢纤维增强的挡土墙(14),用肥料混合型植物土壤形成肥料混合型植被层(13),并用PVC涂层钢丝。

著录项

  • 公开/公告号KR20080071761A

    专利类型

  • 公开/公告日2008-08-05

    原文格式PDF

  • 申请/专利权人 KIM SUNG CHEUL;

    申请/专利号KR20070010039

  • 发明设计人 KIM SUNG CHEUL;

    申请日2007-01-31

  • 分类号E02D29/02;

  • 国家 KR

  • 入库时间 2022-08-21 19:53:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号