首页> 外国专利> Method for Manufacturing Molten Steel by Converter Refining Process

Method for Manufacturing Molten Steel by Converter Refining Process

机译:转炉精炼生产钢水的方法

摘要

PURPOSE: A method for refining molten steel in converter is provided to improve stirring power of slag by repeatedly changing flux of oxygen and melt thus remove skull stuck to oxygen blowing lance during nitrogen splash coating by dividingly injecting iron ore into converter, thereby maximizing reaction in the furnace. CONSTITUTION: In a converter refining method for manufacturing molten steel by injecting a principal raw material of hot metal, a subsidiary raw material of iron ore and coolant into converter and blowing oxygen to molten iron in the converter through lance, the method for refining molten steel in the converter comprises the steps of observing a position of the lance to which skull is adhered by observing an external appearance of the lance; controlling oxygen flux to 54,150 to 59,850 Nm¬3/hr at a time point corresponding to up to 9.5-10.5% of the total blowing time after blowing initiation, alternately maintaining the minimum oxygen flux of 38,900 to 43,000 Nm¬3/hr and the maximum oxygen flux of 57,900 to 64,000 Nm¬3/hr at time point corresponding to from 19-21% to 61-68% of the total blowing time, controlling the oxygen flux to 52,200 to 57,700 Nm¬3/hr at a time point corresponding to from 80-89% to 100% of the total blowing time, and dividingly injecting the iron ore into the converter two or more times at the time point corresponding to from 19-21% to 61-68% of the total blowing time after blowing initiation in case that the skull is adhered to an upper part of the lance; and alternately maintaining the minimum oxygen flux of 38,900 to 43,000 Nm¬3/hr and the maximum oxygen flux of 57,900 to 64,000 Nm¬3/hr at time point corresponding to from 19-21% to 61-68% of the total blowing time after blowing initiation, controlling the oxygen flux to 52,200 to 57,700 Nm¬3/hr at a time point corresponding to from 80-89% to 100% of the total blowing time, controlling height from the surface of the molten iron to the tip of the lance to 1.66 to 1.84 m at the time point corresponding to from 80-89% to 100% of the total blowing time, and dividingly injecting the iron ore into the converter two or more times at the time point corresponding to from 19-21% to 61-68% of the total blowing time after blowing initiation in case that the skull is adhered to a lower part of the lance.
机译:用途:提供一种精炼转炉中钢水的方法,通过反复改变氧气和熔体的通量来提高炉渣的搅拌能力,从而通过在转炉中分批注入铁矿石来去除氮溅镀过程中粘附在吹氧喷枪上的头骨,从而最大程度地提高炉内的反应速度。炉子。组成:在转炉精炼方法中,通过将铁水的主要原料,铁矿石和冷却剂的辅助原料注入转炉,并通过喷枪将氧气吹入转炉中的铁水来制造钢水转换器中包括以下步骤:通过观察矛杆的外观来观察颅骨所附着的矛杆的位置;在吹塑开始后的某个时间点将氧气通量控制在54,150至59,850 Nm‑3 / hr,最高可达总吹气时间的9.5-10.5%,交替保持最小氧气通量38,900至43,000 Nm‑3 / hr,在某个时间点的最大氧气通量为57,900至64,000 Nm‑3 / hr,相当于总吹气时间的19-21%至61-68%,将氧气通量控制在某个时间点为52,200至57,700 Nm‑3 / hr相当于总吹炼时间的80-89%至100%,并在相当于总吹炼时间的19-21%至61-68%的时间点将铁矿石分两次或多次注入转炉在吹塑开始后,如果头骨粘附在喷枪的上部;并在对应于总吹气时间的19-21%至61-68%的时间点交替保持最小氧气通量38,900至43,000Nm¬3/ hr和最大氧气通量57,900至64,000Nm¬3/ hr吹塑开始后,在对应于总吹塑时间的80-89%至100%的时间点,将氧气通量控制在52,200至57,700 Nm3 / hr,控制从铁水表面到铁水尖的高度。在对应于总吹炼时间的80-89%至100%的时间点将喷枪喷至1.66至1.84 m,并在对应于19-21的时间点将铁矿石分两次或多次注入转炉如果头骨粘附在喷枪下部,则开始吹气后总吹气时间的%至61-68%。

著录项

  • 公开/公告号KR100862800B1

    专利类型

  • 公开/公告日2008-10-13

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020049275

  • 发明设计人 김영화;박동수;이갑용;

    申请日2002-08-20

  • 分类号C21C5/28;

  • 国家 KR

  • 入库时间 2022-08-21 19:51:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号