首页>
外国专利>
METHOD DEVELOPMENT steeply inclined coal seam average power and THIN
METHOD DEVELOPMENT steeply inclined coal seam average power and THIN
展开▼
机译:方法开发陡倾斜煤层平均功率和薄。
展开▼
页面导航
摘要
著录项
相似文献
摘要
method of development of coalbed u043au0440u0443u0442u043eu043du0430u043au043bu043eu043du043du044bu0445 average power and thin, which includes training u0432u044bu0435u043cu043eu0447u043du043eu0433u043e pole the transport and u0432u0435u043du0442u0438u043bu00a0u0446u0438u043eu043du043du043e the u0448u0442u0440u0435u043au043eu0432 on u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u044e reservoir, matrix cell line u0437u0430u0431u043eu00a0 education is at an angle to the transport and u0432u0435u043du0442u0438u043bu00a0u0446u0438u043eu043du043du043eu043cu0443 u0448u0442u0440u0435u043au0430u043c and editing it u0441u0435u043au0446u0438 6th mechanized upon the angle to u043bu0438u043du0438u00a0u043c u0437u0430u0431u043eu00a0 and u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u00a0 formationseizure control and maintenance u0443u0433u043bu00a0 at roof control u0437u0430u0431u043eu00a0 u0441u0435u043au0446u0438u00a0u043cu0438 mobile mechanized supports, u043fu0435u0440u0435u0434u0432u0438u0433u0430u0435u043cu044bu043cu0438 after u043fu043eu0434u0432u0438u0433u0430u043du0438u0435u043c line u043eu0447u0438u0441 u0442u043du043eu0433u043e u0437u0430u0431u043eu00a0 on face and in the direction of one of the u0448u0442u0440u0435u043au043eu0432, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 what line of control u0437u0430u0431u043eu00a0 attached inclination toward u043eu0442u0440u0430u0431u0430u0442u044bu0432u0430u0435u043cu043eu0433u043e array approximately equal, n oh, the u0437u0430u043bu0435u0433u0430u043du0438u00a0 formationthe mobile mechanized supports u043fu0435u0440u0435u0434u0432u0438u0433u0430u044eu0442 toward the transport u0448u0442u0440u0435u043au0430, released on the transport u0448u0442u0440u0435u043a section upon the following technical piece u043du0438u00a0 installed in the upper part of the sewage treatment u0437u0430u0431u043eu00a0 on u0441u043eu043fu0440u00a0u0436u0435u043du0438u0438 with u0432u0435u043du0442u0438u043bu00a0u0446u0438u043eu043du043du044bu043c u0448u0442u0440u0435u043au043eu043c and angle section mechanized supports are installed u0435u043bu044cu043du043e line u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u00a0 formation are u043fu0440u00a0u043cu044bu043c.
展开▼