首页> 外国专利> METHOD TO PREVENT GAS FLOW VIA ANNULUS DURING WELL CEMENTING

METHOD TO PREVENT GAS FLOW VIA ANNULUS DURING WELL CEMENTING

机译:固井过程中防止环空流动的方法

摘要

FIELD: oil and gas production, particularly methods or devices for cementing, for plugging holes, crevices, or the like.;SUBSTANCE: method involves securing casing pipes by cementing thereof with cement mortar up to level located over productive reservoir roof; arranging composition having viscoelastic properties over cement mortar; placing plugging composition having setting time exceeding that of cement mortar over viscoelastic composition, wherein the plugging composition has density providing creation of hydrostatic pressure exceeding gas pressure in productive reservoir before hardening of cement mortar supplied within productive reservoir interval. Viscoelastic composition is poured so that viscoelastic composition height is not less than 10 m. The viscoelastic composition is clayless viscoelastic composition.;EFFECT: increased cementing reliability.;4 cl, 1 ex
机译:领域:石油和天然气的生产,特别是用于堵塞孔,缝隙等的水泥的方法或装置。物质:该方法包括通过用水泥砂浆将套管固井直至生产储层顶部上方的高度来固定套管。在水泥砂浆上布置具有粘弹性的组合物;将凝固时间超过水泥砂浆的凝结时间的组合物放置在粘弹性组合物上,其中所述堵塞组合物的密度提供在生产油藏间隔内供应的水泥砂浆硬化之前在生产油藏中产生超过气体压力的静水压力。倒入粘弹性组合物,使得粘弹性组合物的高度不小于10m。粘弹性组合物是无粘土粘弹性组合物。效果:提高固井可靠性。4 cl,1 ex

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号