首页> 外国专利> METHOD FOR CONTROLLING PROCESS OF HYDRO-DISRUPTION OF HYDROCARBON DEPOSIT FORMATION

METHOD FOR CONTROLLING PROCESS OF HYDRO-DISRUPTION OF HYDROCARBON DEPOSIT FORMATION

机译:控制油气成藏过程中水溶过程的方法

摘要

FIELD: seismic research, possible application in oil industry, namely, during control of process of hydro-disruption of a hydrocarbon deposit formation.;SUBSTANCE: in accordance to the method, simultaneous synchronous recording of seismic oscillations at day surface above the face of well in which hydro-disruption of formation take place, is performed. For recording, seismic antenna and digital recording equipment are used. Recording is realized at day surface before conduction of hydro-disruption, in process of it and after hydro-disruption with time alignment with technological processes involved in conduction of hydro-disruption. Processing of seismic signals in real time is performed at every discrete time moment. On basis of results of seismic signal processing, size and direction of development of fissuring surfaces are determined, ensuring control of process of hydro-disruption of a formation.;EFFECT: optimized conduction of hydro-disruption of a formation.;3 dwg
机译:领域:地震研究,可能在石油工业中的应用,即在控制碳氢化合物沉积物地层的水力破坏过程中;物质:根据该方法,同时同步记录井眼上方地表的地震振荡其中发生地层的水力破坏。对于记录,使用地震天线和数字记录设备。在进行水力破坏之前,进行过程中以及在水力破坏之后的白天,与涉及水力破坏进行的技术过程的时间对准,实现记录。在每个离散时刻实时执行地震信号处理。根据地震信号处理的结果,确定裂缝表面的大小和发展方向,确保对地层水力破坏过程的控制。效果:地层水力破坏的优化传导; 3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号